ENTRY            O0225   19960918                             0000O022500000001 
SUBENT        O0225001   19960918                             0000O022500100001 
BIB                 13         28                                 O022500100002 
TITLE      High-Resolution Study of Pb-208 With 35-Mev Protons.   O022500100003 
AUTHOR     (W.T.WAGNER,G.M.CRAWLEY,G.R.HAMMERSTEIN,H.MCMANUC)     O022500100004 
INSTITUTE  (1USAMSU)                                             AO022500100005 
REFERENCE  (J,PR/C,12,757,75)                                     O022500100006 
HISTORY    (960701C)                                              O022500100007 
           (960916A) Bib Sections Are Corrected.                  O022500100008 
           (960918U) Last checking has been done.                 O022500100009 
SAMPLE     A 6.0 Mg/Cm**2 Self-Supporting Foil,Made by Rolling,   O022500100010 
           Served As the Target.The Lead Used in All Target       O022500100011 
           Fabrication was Isotopically Enriched to 99.14% Pb-208.O022500100012 
ADD-RES    (COMP).Microscopic Dwba Analysis.                      O022500100013 
           (STRUC)                                                O022500100014 
DETECTOR   (MAGSP).The Engle Split-Pole Spectrometer.             O022500100015 
           (PLATE) Nuclear Emulsion in Focal Plane.               O022500100016 
           (NAICR).A Nai(TL) Detector For Beam Monitoring by      O022500100017 
           Elastic Scattering.                                    O022500100018 
FACILITY   (CYCLO,1USAMSU).The Michigan State University Sector-  O022500100019 
           Focused Cyclotron.                                     O022500100020 
METHOD     (SITA) Targets of About 100 Mu-Gramm/Cm**2 Thickness   O022500100021 
           were Used Throughout the High Resolution Study and wereO022500100022 
           Prepared by Vacuum Evaporation on a 15-20              O022500100023 
           Mu-Gramm/Cm**2 Carbon Foil With a Substrate of One or  O022500100024 
           Two Layers of Formvar.                                 O022500100025 
ERR-ANALYS (ANG-ERR).Data-Point Reader Uncertainty.               O022500100026 
STATUS     (CURVE).By Cajad.                                      O022500100027 
COMMENT    - By Compiler - The Data Are Presented on Small Size   O022500100028 
           Figures. Therefore Some Data Points Could be Missed    O022500100029 
           During to Data Reading.                                O022500100030 
ENDBIB              28          0                                 O022500100031 
COMMON               1          3                                 O022500100032 
EN                                                                O022500100033 
MEV                                                               O022500100034 
        35.                                                       O022500100035 
ENDCOMMON            3          0                                 O022500100036 
ENDSUBENT           35          0                                 O022500199999 
SUBENT        O0225002   19960918                             0000O022500200001 
BIB                  3          3                                 O022500200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500200004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022500200005 
ENDBIB               3          0                                 O022500200006 
COMMON               3          3                                 O022500200007 
E-EXC      ANG-ERR    DATA-ERR                                    O022500200008 
MEV        ADEG       PER-CENT                                    O022500200009 
      2.615        0.5         3.                                 O022500200010 
ENDCOMMON            3          0                                 O022500200011 
DATA                 2         23                                 O022500200012 
ANG-CM     DATA                                                   O022500200013 
ADEG       MB/SR                                                  O022500200014 
       11.4        1.3                                            O022500200015 
       16.4       1.19                                            O022500200016 
       19.4       3.31                                            O022500200017 
       22.6        5.9                                            O022500200018 
       26.1        6.7                                            O022500200019 
       29.8       6.17                                            O022500200020 
       33.6        4.3                                            O022500200021 
       33.9       2.54                                            O022500200022 
       39.9       1.59                                            O022500200023 
       43.5        1.6                                            O022500200024 
       48.4       1.77                                            O022500200025 
        52.       1.79                                            O022500200026 
       55.8       1.31                                            O022500200027 
       63.3       0.73                                            O022500200028 
       69.1      0.675                                            O022500200029 
       70.6       0.59                                            O022500200030 
       74.2      0.543                                            O022500200031 
       80.1      0.479                                            O022500200032 
       83.8       0.35                                            O022500200033 
       87.9      0.308                                            O022500200034 
       91.6       0.23                                            O022500200035 
       94.9      0.197                                            O022500200036 
       98.5      0.199                                            O022500200037 
ENDDATA             25          0                                 O022500200038 
ENDSUBENT           37          0                                 O022500299999 
SUBENT        O0225003   19960918                             0000O022500300001 
BIB                  3          3                                 O022500300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500300004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022500300005 
ENDBIB               3          0                                 O022500300006 
COMMON               3          3                                 O022500300007 
E-EXC      ANG-ERR    DATA-ERR                                    O022500300008 
MEV        ADEG       PER-CENT                                    O022500300009 
      3.198        0.5         3.                                 O022500300010 
ENDCOMMON            3          0                                 O022500300011 
DATA                 2         23                                 O022500300012 
ANG-CM     DATA                                                   O022500300013 
ADEG       MB/SR                                                  O022500300014 
        9.3      0.454                                            O022500300015 
       12.2       0.38                                            O022500300016 
       19.9      0.518                                            O022500300017 
       23.4       0.52                                            O022500300018 
       26.9        0.6                                            O022500300019 
        29.       0.66                                            O022500300020 
       32.5      0.665                                            O022500300021 
       37.4       0.79                                            O022500300022 
       39.6      0.674                                            O022500300023 
        44.      0.519                                            O022500300024 
       47.8      0.348                                            O022500300025 
       52.4      0.205                                            O022500300026 
        56.       0.18                                            O022500300027 
       59.9      0.182                                            O022500300028 
       68.9      0.138                                            O022500300029 
        74.      0.119                                            O022500300030 
       76.4  0.762E-01                                            O022500300031 
       79.8  0.877E-01                                            O022500300032 
       83.5  0.705E-01                                            O022500300033 
       87.1  0.621E-01                                            O022500300034 
       90.8  0.499E-01                                            O022500300035 
       94.4  0.459E-01                                            O022500300036 
        98.  0.404E-01                                            O022500300037 
ENDDATA             25          0                                 O022500300038 
ENDSUBENT           37          0                                 O022500399999 
SUBENT        O0225004   19960918                             0000O022500400001 
BIB                  3          4                                 O022500400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500400006 
ENDBIB               4          0                                 O022500400007 
COMMON               3          3                                 O022500400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500400009 
MEV        ADEG       PER-CENT                                    O022500400010 
      3.475        0.5         3.                                 O022500400011 
ENDCOMMON            3          0                                 O022500400012 
DATA                 3         19                                 O022500400013 
ANG-CM     DATA       ERR-T                                       O022500400014 
ADEG       MB/SR      PER-CENT                                    O022500400015 
        19.   0.35E-01        50.                                 O022500400016 
        24.   0.28E-01        60.                                 O022500400017 
       27.5   0.26E-01        19.                                 O022500400018 
        31.   0.33E-01        27.                                 O022500400019 
       31.1   0.18E-01        22.                                 O022500400020 
       36.7  0.281E-01                                            O022500400021 
       40.2  0.225E-01                                            O022500400022 
       43.8  0.206E-01         7.                                 O022500400023 
       48.8  0.132E-01        11.                                 O022500400024 
       54.4  0.165E-01                                            O022500400025 
       55.9  0.115E-01                                            O022500400026 
       59.5   0.92E-02                                            O022500400027 
       65.1  0.106E-01                                            O022500400028 
       75.8   0.74E-02                                            O022500400029 
       79.3   0.59E-02                                            O022500400030 
        90.  0.434E-02                                            O022500400031 
       91.4   0.38E-02                                            O022500400032 
       95.1   0.19E-02        21.                                 O022500400033 
      100.7   0.22E-02        18.                                 O022500400034 
ENDDATA             21          0                                 O022500400035 
ENDSUBENT           34          0                                 O022500499999 
SUBENT        O0225005   19960918                             0000O022500500001 
BIB                  3          4                                 O022500500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500500006 
ENDBIB               4          0                                 O022500500007 
COMMON               3          3                                 O022500500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500500009 
MEV        ADEG       PER-CENT                                    O022500500010 
      3.709        0.5         3.                                 O022500500011 
ENDCOMMON            3          0                                 O022500500012 
DATA                 3         20                                 O022500500013 
ANG-CM     DATA       ERR-T                                       O022500500014 
ADEG       MB/SR      PER-CENT                                    O022500500015 
       19.2       0.15        27.                                 O022500500016 
       24.8      0.169                                            O022500500017 
       28.2      0.214                                            O022500500018 
       29.6      0.215                                            O022500500019 
       33.1      0.197                                            O022500500020 
       36.5      0.273                                            O022500500021 
       40.2        0.2                                            O022500500022 
       43.8      0.161                                            O022500500023 
       47.5      0.105                                            O022500500024 
       51.1   0.72E-01                                            O022500500025 
       56.9   0.58E-01                                            O022500500026 
       60.4  0.584E-01                                            O022500500027 
       65.3   0.59E-01                                            O022500500028 
       68.1   0.62E-01                                            O022500500029 
       76.1  0.349E-01                                            O022500500030 
       80.4  0.245E-01                                            O022500500031 
       83.2  0.258E-01                                            O022500500032 
       92.4  0.224E-01                                            O022500500033 
        96.  0.184E-01                                            O022500500034 
       99.5  0.185E-01                                            O022500500035 
ENDDATA             22          0                                 O022500500036 
ENDSUBENT           35          0                                 O022500599999 
SUBENT        O0225006   19960918                             0000O022500600001 
BIB                  3          4                                 O022500600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500600006 
ENDBIB               4          0                                 O022500600007 
COMMON               3          3                                 O022500600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500600009 
MEV        ADEG       PER-CENT                                    O022500600010 
      3.919        0.5         3.                                 O022500600011 
ENDCOMMON            3          0                                 O022500600012 
DATA                 3         11                                 O022500600013 
ANG-CM     DATA       ERR-T                                       O022500600014 
ADEG       MB/SR      PER-CENT                                    O022500600015 
       22.7  0.371E-01                                            O022500600016 
       28.3  0.325E-01                                            O022500600017 
       33.1  0.327E-01                                            O022500600018 
       38.8   0.26E-01                                            O022500600019 
       40.3  0.207E-01                                            O022500600020 
       50.4  0.332E-01                                            O022500600021 
       63.1  0.212E-01                                            O022500600022 
       68.1  0.135E-01                                            O022500600023 
       73.9   0.78E-02        21.                                 O022500600024 
       80.9   0.68E-02        10.                                 O022500600025 
       98.6   0.28E-02        21.                                 O022500600026 
ENDDATA             13          0                                 O022500600027 
ENDSUBENT           26          0                                 O022500699999 
SUBENT        O0225007   19960918                             0000O022500700001 
BIB                  3          4                                 O022500700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500700006 
ENDBIB               4          0                                 O022500700007 
COMMON               3          3                                 O022500700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500700009 
MEV        ADEG       PER-CENT                                    O022500700010 
      3.946        0.5        2.5                                 O022500700011 
ENDCOMMON            3          0                                 O022500700012 
DATA                 3         13                                 O022500700013 
ANG-CM     DATA       ERR-T                                       O022500700014 
ADEG       MB/SR      PER-CENT                                    O022500700015 
       18.5   0.17E-01        60.                                 O022500700016 
       25.3   0.37E-01        14.                                 O022500700017 
       30.4    0.2E-01        20.                                 O022500700018 
       34.1  0.105E-01        21.                                 O022500700019 
       38.4  0.111E-01        25.                                 O022500700020 
       44.5  0.112E-01                                            O022500700021 
       47.1  0.139E-01         8.                                 O022500700022 
       56.4   0.15E-01        20.                                 O022500700023 
       69.5   0.45E-02        22.                                 O022500700024 
       73.1   0.21E-02        30.                                 O022500700025 
       80.3    0.5E-02        30.                                 O022500700026 
       86.5    0.6E-03        50.                                 O022500700027 
      106.5    0.6E-03        50.                                 O022500700028 
ENDDATA             15          0                                 O022500700029 
ENDSUBENT           28          0                                 O022500799999 
SUBENT        O0225008   19960918                             0000O022500800001 
BIB                  3          4                                 O022500800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500800006 
ENDBIB               4          0                                 O022500800007 
COMMON               3          3                                 O022500800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500800009 
MEV        ADEG       PER-CENT                                    O022500800010 
      3.961        0.5         3.                                 O022500800011 
ENDCOMMON            3          0                                 O022500800012 
DATA                 3         14                                 O022500800013 
ANG-CM     DATA       ERR-T                                       O022500800014 
ADEG       MB/SR      PER-CENT                                    O022500800015 
        11.   0.43E-01        50.                                 O022500800016 
       14.4   0.18E-01        50.                                 O022500800017 
       19.1   0.23E-01        26.                                 O022500800018 
       22.3  0.349E-01                                            O022500800019 
        29.  0.435E-01                                            O022500800020 
       35.6   0.75E-01                                            O022500800021 
        39.  0.674E-01                                            O022500800022 
        41.  0.675E-01                                            O022500800023 
       51.3   0.62E-01                                            O022500800024 
       63.3  0.188E-01                                            O022500800025 
        69.   0.99E-02                                            O022500800026 
       72.9   0.64E-02        30.                                 O022500800027 
       80.6  0.737E-02                                            O022500800028 
       99.9   0.39E-02        21.                                 O022500800029 
ENDDATA             16          0                                 O022500800030 
ENDSUBENT           29          0                                 O022500899999 
SUBENT        O0225009   19960918                             0000O022500900001 
BIB                  3          4                                 O022500900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022500900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022500900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022500900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022500900006 
ENDBIB               4          0                                 O022500900007 
COMMON               3          3                                 O022500900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022500900009 
MEV        ADEG       PER-CENT                                    O022500900010 
      3.995        0.5         3.                                 O022500900011 
ENDCOMMON            3          0                                 O022500900012 
DATA                 3         12                                 O022500900013 
ANG-CM     DATA       ERR-T                                       O022500900014 
ADEG       MB/SR      PER-CENT                                    O022500900015 
        11.   0.46E-01        30.                                 O022500900016 
       14.7   0.36E-01        22.                                 O022500900017 
       20.5  0.563E-01                                            O022500900018 
       25.7  0.514E-01                                            O022500900019 
       31.5  0.512E-01                                            O022500900020 
       36.7  0.447E-01                                            O022500900021 
       40.3  0.446E-01                                            O022500900022 
       49.9   0.23E-01        17.                                 O022500900023 
       69.7   0.75E-02        11.                                 O022500900024 
       73.3   0.48E-02        30.                                 O022500900025 
       90.6   0.36E-02        25.                                 O022500900026 
      102.7    0.2E-02        30.                                 O022500900027 
ENDDATA             14          0                                 O022500900028 
ENDSUBENT           27          0                                 O022500999999 
SUBENT        O0225010   19960918                             0000O022501000001 
BIB                  3          4                                 O022501000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501000006 
ENDBIB               4          0                                 O022501000007 
COMMON               3          3                                 O022501000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501000009 
MEV        ADEG       PER-CENT                                    O022501000010 
      4.037        0.5         3.                                 O022501000011 
ENDCOMMON            3          0                                 O022501000012 
DATA                 3         15                                 O022501000013 
ANG-CM     DATA       ERR-T                                       O022501000014 
ADEG       MB/SR      PER-CENT                                    O022501000015 
       11.7      0.209                                            O022501000016 
       13.8      0.188                                            O022501000017 
       18.6       0.17                                            O022501000018 
       24.1      0.111                                            O022501000019 
       28.9      0.102                                            O022501000020 
       32.3  0.904E-01                                            O022501000021 
       39.2  0.734E-01                                            O022501000022 
       41.3  0.835E-01                                            O022501000023 
       51.6      0.174                                            O022501000024 
       63.3      0.133                                            O022501000025 
       68.8  0.749E-01                                            O022501000026 
       73.6  0.752E-01                                            O022501000027 
       80.5   0.37E-01        19.                                 O022501000028 
       90.8  0.144E-01                                            O022501000029 
      101.1   0.73E-02                                            O022501000030 
ENDDATA             17          0                                 O022501000031 
ENDSUBENT           30          0                                 O022501099999 
SUBENT        O0225011   19960918                             0000O022501100001 
BIB                  3          4                                 O022501100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501100006 
ENDBIB               4          0                                 O022501100007 
COMMON               3          3                                 O022501100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501100009 
MEV        ADEG       PER-CENT                                    O022501100010 
      4.054        0.5         3.                                 O022501100011 
ENDCOMMON            3          0                                 O022501100012 
DATA                 3         13                                 O022501100013 
ANG-CM     DATA       ERR-T                                       O022501100014 
ADEG       MB/SR      PER-CENT                                    O022501100015 
        9.6   0.54E-01        40.                                 O022501100016 
       13.1    0.4E-01        28.                                 O022501100017 
       16.6    0.5E-01                                            O022501100018 
       26.9    0.7E-01                                            O022501100019 
       32.6  0.407E-01                                            O022501100020 
       37.5  0.449E-01                                            O022501100021 
       39.7  0.285E-01                                            O022501100022 
       50.1  0.363E-01                                            O022501100023 
       62.3   0.54E-02        15.                                 O022501100024 
       65.9   0.34E-02        12.                                 O022501100025 
       72.9   0.28E-02        40.                                 O022501100026 
       90.4   0.16E-02        19.                                 O022501100027 
       99.3   0.31E-02        26.                                 O022501100028 
ENDDATA             15          0                                 O022501100029 
ENDSUBENT           28          0                                 O022501199999 
SUBENT        O0225012   19960918                             0000O022501200001 
BIB                  3          3                                 O022501200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501200004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022501200005 
ENDBIB               3          0                                 O022501200006 
COMMON               3          3                                 O022501200007 
E-EXC      ANG-ERR    DATA-ERR                                    O022501200008 
MEV        ADEG       PER-CENT                                    O022501200009 
      4.085        0.5         3.                                 O022501200010 
ENDCOMMON            3          0                                 O022501200011 
DATA                 2         20                                 O022501200012 
ANG-CM     DATA                                                   O022501200013 
ADEG       MB/SR                                                  O022501200014 
       20.3       1.55                                            O022501200015 
       23.7       1.91                                            O022501200016 
       27.6      0.855                                            O022501200017 
       31.4      0.548                                            O022501200018 
       31.5      0.399                                            O022501200019 
       37.1      0.554                                            O022501200020 
       38.4      0.697                                            O022501200021 
        42.        0.7                                            O022501200022 
       47.8      0.518                                            O022501200023 
       52.9       0.36                                            O022501200024 
       56.5      0.367                                            O022501200025 
       60.1       0.29                                            O022501200026 
       63.7      0.265                                            O022501200027 
       67.4      0.218                                            O022501200028 
       73.5      0.193                                            O022501200029 
        80.      0.142                                            O022501200030 
       84.1   0.91E-01                                            O022501200031 
       89.2   0.74E-01                                            O022501200032 
       96.4  0.652E-01                                            O022501200033 
       100.    0.6E-01                                            O022501200034 
ENDDATA             22          0                                 O022501200035 
ENDSUBENT           34          0                                 O022501299999 
SUBENT        O0225013   19960918                             0000O022501300001 
BIB                  3          4                                 O022501300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501300006 
ENDBIB               4          0                                 O022501300007 
COMMON               3          3                                 O022501300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501300009 
MEV        ADEG       PER-CENT                                    O022501300010 
      4.106        0.5        2.5                                 O022501300011 
ENDCOMMON            3          0                                 O022501300012 
DATA                 3         14                                 O022501300013 
ANG-CM     DATA       ERR-T                                       O022501300014 
ADEG       MB/SR      PER-CENT                                    O022501300015 
       19.2   0.29E-01        70.                                 O022501300016 
       22.8   0.34E-01        30.                                 O022501300017 
       30.1  0.652E-01                                            O022501300018 
       37.7  0.376E-01                                            O022501300019 
       42.4   0.19E-01        16.                                 O022501300020 
       48.1  0.197E-01                                            O022501300021 
       50.8  0.159E-01        11.                                 O022501300022 
       60.2  0.107E-01        21.                                 O022501300023 
       71.7   0.58E-02        21.                                 O022501300024 
        77.   0.25E-02        28.                                 O022501300025 
       83.2   0.17E-02        50.                                 O022501300026 
       89.2   0.37E-02        24.                                 O022501300027 
       99.6   0.25E-02        28.                                 O022501300028 
      109.8   0.21E-02        29.                                 O022501300029 
ENDDATA             16          0                                 O022501300030 
ENDSUBENT           29          0                                 O022501399999 
SUBENT        O0225014   19960918                             0000O022501400001 
BIB                  3          4                                 O022501400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501400006 
ENDBIB               4          0                                 O022501400007 
COMMON               3          3                                 O022501400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501400009 
MEV        ADEG       PER-CENT                                    O022501400010 
      4.125        0.5         3.                                 O022501400011 
ENDCOMMON            3          0                                 O022501400012 
DATA                 3         15                                 O022501400013 
ANG-CM     DATA       ERR-T                                       O022501400014 
ADEG       MB/SR      PER-CENT                                    O022501400015 
        8.9   0.45E-01        40.                                 O022501400016 
       12.4   0.65E-01        20.                                 O022501400017 
       16.3      0.111                                            O022501400018 
        21.      0.102                                            O022501400019 
       28.2  0.456E-01                                            O022501400020 
       31.8  0.366E-01                                            O022501400021 
       37.5  0.336E-01                                            O022501400022 
        39.  0.275E-01                                            O022501400023 
       49.8  0.152E-01        18.                                 O022501400024 
       64.1  0.219E-01                                            O022501400025 
       67.7  0.192E-01                                            O022501400026 
       73.4   0.15E-01        25.                                 O022501400027 
        82.   0.99E-02        13.                                 O022501400028 
       91.4   0.51E-02        10.                                 O022501400029 
       100.   0.41E-02        20.                                 O022501400030 
ENDDATA             17          0                                 O022501400031 
ENDSUBENT           30          0                                 O022501499999 
SUBENT        O0225015   19960918                             0000O022501500001 
BIB                  3          3                                 O022501500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022501500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501500005 
ENDBIB               3          0                                 O022501500006 
COMMON               2          3                                 O022501500007 
E-EXC      ANG-ERR                                                O022501500008 
MEV        ADEG                                                   O022501500009 
      4.141        0.5                                            O022501500010 
ENDCOMMON            3          0                                 O022501500011 
DATA                 3         15                                 O022501500012 
ANG-CM     DATA       ERR-T                                       O022501500013 
ADEG       MB/SR      PER-CENT                                    O022501500014 
       12.1       0.33        70.                                 O022501500015 
       13.8       0.18        60.                                 O022501500016 
       20.7       0.41        17.                                 O022501500017 
       24.1      0.336         4.                                 O022501500018 
       29.3   0.98E-01        40.                                 O022501500019 
       34.5    0.8E-01        20.                                 O022501500020 
        40.      0.139        12.                                 O022501500021 
       41.4   0.59E-01        80.                                 O022501500022 
       51.7   0.52E-01        40.                                 O022501500023 
       64.1   0.48E-01        21.                                 O022501500024 
        69.    0.6E-01        22.                                 O022501500025 
       74.5   0.34E-01        50.                                 O022501500026 
       81.7   0.27E-01        19.                                 O022501500027 
       91.7   0.13E-01        30.                                 O022501500028 
      103.4    0.9E-02        30.                                 O022501500029 
ENDDATA             17          0                                 O022501500030 
ENDSUBENT           29          0                                 O022501599999 
SUBENT        O0225016   19960918                             0000O022501600001 
BIB                  3          3                                 O022501600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022501600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501600005 
ENDBIB               3          0                                 O022501600006 
COMMON               2          3                                 O022501600007 
E-EXC      ANG-ERR                                                O022501600008 
MEV        ADEG                                                   O022501600009 
      4.159        0.5                                            O022501600010 
ENDCOMMON            3          0                                 O022501600011 
DATA                 3         10                                 O022501600012 
ANG-CM     DATA       ERR-T                                       O022501600013 
ADEG       MB/SR      PER-CENT                                    O022501600014 
       18.3   0.24E-01        50.                                 O022501600015 
       22.6   0.29E-01        24.                                 O022501600016 
       26.8   0.11E-01        40.                                 O022501600017 
       31.7   0.11E-01        19.                                 O022501600018 
       42.7  0.116E-01        12.                                 O022501600019 
       53.7   0.56E-02        50.                                 O022501600020 
       70.2   0.36E-02        30.                                 O022501600021 
       75.4   0.25E-02        50.                                 O022501600022 
       92.3   0.41E-03        70.                                 O022501600023 
      101.4    0.8E-03        50.                                 O022501600024 
ENDDATA             12          0                                 O022501600025 
ENDSUBENT           24          0                                 O022501699999 
SUBENT        O0225017   19960918                             0000O022501700001 
BIB                  3          4                                 O022501700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501700006 
ENDBIB               4          0                                 O022501700007 
COMMON               3          3                                 O022501700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501700009 
MEV        ADEG       PER-CENT                                    O022501700010 
      4.181        0.5         3.                                 O022501700011 
ENDCOMMON            3          0                                 O022501700012 
DATA                 3         15                                 O022501700013 
ANG-CM     DATA       ERR-T                                       O022501700014 
ADEG       MB/SR      PER-CENT                                    O022501700015 
        9.7   0.77E-01        30.                                 O022501700016 
       13.5   0.28E-01        40.                                 O022501700017 
       18.7   0.55E-01        13.                                 O022501700018 
       23.4    0.7E-01                                            O022501700019 
        27.  0.446E-01                                            O022501700020 
       33.8  0.559E-01                                            O022501700021 
       37.4  0.364E-01                                            O022501700022 
       40.9  0.366E-01                                            O022501700023 
       51.2  0.371E-01                                            O022501700024 
       63.9  0.159E-01                                            O022501700025 
       67.7   0.15E-01                                            O022501700026 
       72.3   0.95E-02        15.                                 O022501700027 
       79.1  0.119E-01                                            O022501700028 
       89.8   0.41E-02        20.                                 O022501700029 
       99.2   0.33E-02        21.                                 O022501700030 
ENDDATA             17          0                                 O022501700031 
ENDSUBENT           30          0                                 O022501799999 
SUBENT        O0225018   19960918                             0000O022501800001 
BIB                  3          4                                 O022501800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022501800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501800006 
ENDBIB               4          0                                 O022501800007 
COMMON               3          3                                 O022501800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501800009 
MEV        ADEG       PER-CENT                                    O022501800010 
      4.206        0.5         3.                                 O022501800011 
ENDCOMMON            3          0                                 O022501800012 
DATA                 3         14                                 O022501800013 
ANG-CM     DATA       ERR-T                                       O022501800014 
ADEG       MB/SR      PER-CENT                                    O022501800015 
        9.4    0.4E-01        50.                                 O022501800016 
       13.2   0.19E-01        50.                                 O022501800017 
       16.8   0.17E-01        24.                                 O022501800018 
       21.7   0.26E-01        15.                                 O022501800019 
       27.5  0.168E-01        17.                                 O022501800020 
       31.4  0.208E-01        12.                                 O022501800021 
       36.1  0.168E-01        13.                                 O022501800022 
       39.6  0.195E-01        11.                                 O022501800023 
       46.7  0.295E-01                                            O022501800024 
       63.4    0.1E-01        20.                                 O022501800025 
       66.9  0.135E-01                                            O022501800026 
       72.1   0.66E-02        24.                                 O022501800027 
       79.3   0.52E-02        12.                                 O022501800028 
       90.1   0.34E-02        18.                                 O022501800029 
ENDDATA             16          0                                 O022501800030 
ENDSUBENT           29          0                                 O022501899999 
SUBENT        O0225019   19960918                             0000O022501900001 
BIB                  3          4                                 O022501900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022501900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022501900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022501900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022501900006 
ENDBIB               4          0                                 O022501900007 
COMMON               3          3                                 O022501900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022501900009 
MEV        ADEG       PER-CENT                                    O022501900010 
      4.230        0.5         3.                                 O022501900011 
ENDCOMMON            3          0                                 O022501900012 
DATA                 3         14                                 O022501900013 
ANG-CM     DATA       ERR-T                                       O022501900014 
ADEG       MB/SR      PER-CENT                                    O022501900015 
        7.9       0.11        23.                                 O022501900016 
       11.4      0.108                                            O022501900017 
       16.3      0.119                                            O022501900018 
       21.7      0.171         7.                                 O022501900019 
       25.1      0.236                                            O022501900020 
       30.8   0.55E-01        11.                                 O022501900021 
       37.2  0.246E-01         7.                                 O022501900022 
       38.3   0.22E-01         7.                                 O022501900023 
       48.9  0.198E-01        11.                                 O022501900024 
       61.8  0.127E-01        17.                                 O022501900025 
       66.1   0.59E-02        12.                                 O022501900026 
       72.9   0.47E-02        40.                                 O022501900027 
        80.   0.41E-02        60.                                 O022501900028 
       90.8   0.27E-02        26.                                 O022501900029 
ENDDATA             16          0                                 O022501900030 
ENDSUBENT           29          0                                 O022501999999 
SUBENT        O0225020   19960918                             0000O022502000001 
BIB                  3          4                                 O022502000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502000006 
ENDBIB               4          0                                 O022502000007 
COMMON               3          3                                 O022502000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502000009 
MEV        ADEG       PER-CENT                                    O022502000010 
      4.256        0.5        2.5                                 O022502000011 
ENDCOMMON            3          0                                 O022502000012 
DATA                 3         14                                 O022502000013 
ANG-CM     DATA       ERR-T                                       O022502000014 
ADEG       MB/SR      PER-CENT                                    O022502000015 
        13.      0.211                                            O022502000016 
       17.1      0.144                                            O022502000017 
       22.9      0.279                                            O022502000018 
       32.4      0.327                                            O022502000019 
       38.2      0.143                                            O022502000020 
       43.6   0.59E-01                                            O022502000021 
       45.1  0.747E-01                                            O022502000022 
       54.1  0.547E-01                                            O022502000023 
        68.   0.23E-01                                            O022502000024 
       72.1  0.156E-01                                            O022502000025 
       76.3  0.134E-01        21.                                 O022502000026 
       85.4 0.1156E-01                                            O022502000027 
       94.8   0.94E-02                                            O022502000028 
      104.9   0.57E-02        11.                                 O022502000029 
ENDDATA             16          0                                 O022502000030 
ENDSUBENT           29          0                                 O022502099999 
SUBENT        O0225021   19960918                             0000O022502100001 
BIB                  3          4                                 O022502100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502100006 
ENDBIB               4          0                                 O022502100007 
COMMON               3          3                                 O022502100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502100009 
MEV        ADEG       PER-CENT                                    O022502100010 
      4.296        0.5        2.5                                 O022502100011 
ENDCOMMON            3          0                                 O022502100012 
DATA                 3         13                                 O022502100013 
ANG-CM     DATA       ERR-T                                       O022502100014 
ADEG       MB/SR      PER-CENT                                    O022502100015 
        15.   0.66E-01        30.                                 O022502100016 
       17.3   0.37E-01        40.                                 O022502100017 
       21.9   0.42E-01        14.                                 O022502100018 
       32.4  0.393E-01                                            O022502100019 
       37.5   0.72E-01                                            O022502100020 
       41.6    0.5E-01                                            O022502100021 
       44.4  0.416E-01                                            O022502100022 
       54.2   0.39E-01                                            O022502100023 
       67.3  0.156E-01         6.                                 O022502100024 
       71.1  0.122E-01                                            O022502100025 
        76.  0.115E-01        20.                                 O022502100026 
       93.7   0.42E-02        17.                                 O022502100027 
      102.8   0.36E-02        22.                                 O022502100028 
ENDDATA             15          0                                 O022502100029 
ENDSUBENT           28          0                                 O022502199999 
SUBENT        O0225022   19960918                             0000O022502200001 
BIB                  3          4                                 O022502200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502200006 
ENDBIB               4          0                                 O022502200007 
COMMON               3          3                                 O022502200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502200009 
MEV        ADEG       PER-CENT                                    O022502200010 
      4.324        0.5         3.                                 O022502200011 
ENDCOMMON            3          0                                 O022502200012 
DATA                 3         21                                 O022502200013 
ANG-CM     DATA       ERR-T                                       O022502200014 
ADEG       MB/SR      PER-CENT                                    O022502200015 
       16.4        0.5        14.                                 O022502200016 
        20.       0.43        19.                                 O022502200017 
       23.4      0.862                                            O022502200018 
        29.       1.09                                            O022502200019 
       30.4       1.26                                            O022502200020 
        33.        1.1                                            O022502200021 
       36.2       1.01                                            O022502200022 
       41.3        0.8                                            O022502200023 
        45.      0.454                                            O022502200024 
       48.7      0.332                                            O022502200025 
        53.      0.306                                            O022502200026 
       57.9       0.37                                            O022502200027 
       65.1      0.343                                            O022502200028 
       68.7      0.245                                            O022502200029 
       72.8      0.176                                            O022502200030 
       77.5      0.126                                            O022502200031 
       84.7      0.114                                            O022502200032 
       88.2      0.126                                            O022502200033 
       93.6      0.127                                            O022502200034 
       97.5      0.128                                            O022502200035 
      101.3  0.651E-01                                            O022502200036 
ENDDATA             23          0                                 O022502200037 
ENDSUBENT           36          0                                 O022502299999 
SUBENT        O0225023   19960918                             0000O022502300001 
BIB                  3          4                                 O022502300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502300006 
ENDBIB               4          0                                 O022502300007 
COMMON               3          3                                 O022502300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502300009 
MEV        ADEG       PER-CENT                                    O022502300010 
      4.357        0.5        2.5                                 O022502300011 
ENDCOMMON            3          0                                 O022502300012 
DATA                 3         14                                 O022502300013 
ANG-CM     DATA       ERR-T                                       O022502300014 
ADEG       MB/SR      PER-CENT                                    O022502300015 
        13.   0.28E-01        60.                                 O022502300016 
       14.9   0.41E-01        24.                                 O022502300017 
       20.2  0.572E-01                                            O022502300018 
       25.1  0.663E-01                                            O022502300019 
       31.1  0.768E-01                                            O022502300020 
        35.  0.724E-01                                            O022502300021 
       40.8  0.367E-01                                            O022502300022 
       43.3  0.539E-01                                            O022502300023 
       52.4  0.401E-01                                            O022502300024 
       65.5  0.165E-01                                            O022502300025 
       70.4 0.1127E-01                                            O022502300026 
       73.9   0.14E-01        21.                                 O022502300027 
       91.3   0.59E-02        15.                                 O022502300028 
      100.4   0.58E-02        16.                                 O022502300029 
ENDDATA             16          0                                 O022502300030 
ENDSUBENT           29          0                                 O022502399999 
SUBENT        O0225024   19960918                             0000O022502400001 
BIB                  3          3                                 O022502400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502400005 
ENDBIB               3          0                                 O022502400006 
COMMON               2          3                                 O022502400007 
E-EXC      ANG-ERR                                                O022502400008 
MEV        ADEG                                                   O022502400009 
      4.385        0.5                                            O022502400010 
ENDCOMMON            3          0                                 O022502400011 
DATA                 3         10                                 O022502400012 
ANG-CM     DATA       ERR-T                                       O022502400013 
ADEG       MB/SR      PER-CENT                                    O022502400014 
       18.5   0.24E-01        21.                                 O022502400015 
       21.9   0.15E-01        20.                                 O022502400016 
       27.4  0.174E-01        15.                                 O022502400017 
       32.2   0.98E-02        26.                                 O022502400018 
       41.1   0.98E-02        20.                                 O022502400019 
       49.3   0.11E-01        27.                                 O022502400020 
       61.6   0.14E-01        15.                                 O022502400021 
       71.8   0.58E-02        22.                                 O022502400022 
       88.9    0.3E-02        23.                                 O022502400023 
       99.2   0.51E-02        20.                                 O022502400024 
ENDDATA             12          0                                 O022502400025 
ENDSUBENT           24          0                                 O022502499999 
SUBENT        O0225025   19960918                             0000O022502500001 
BIB                  3          4                                 O022502500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502500006 
ENDBIB               4          0                                 O022502500007 
COMMON               3          3                                 O022502500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502500009 
MEV        ADEG       PER-CENT                                    O022502500010 
      4.403        0.5        2.5                                 O022502500011 
ENDCOMMON            3          0                                 O022502500012 
DATA                 3         11                                 O022502500013 
ANG-CM     DATA       ERR-T                                       O022502500014 
ADEG       MB/SR      PER-CENT                                    O022502500015 
       12.5    0.6E-02        70.                                 O022502500016 
       18.6    0.9E-02        70.                                 O022502500017 
       23.9   0.11E-01        40.                                 O022502500018 
       29.6  0.196E-01                                            O022502500019 
       33.7   0.11E-01        27.                                 O022502500020 
       39.2   0.68E-02        29.                                 O022502500021 
       39.7   0.29E-02        60.                                 O022502500022 
       63.3   0.45E-02        27.                                 O022502500023 
       69.3   0.39E-02        23.                                 O022502500024 
       89.9   0.54E-03        50.                                 O022502500025 
      101.8   0.27E-02        22.                                 O022502500026 
ENDDATA             13          0                                 O022502500027 
ENDSUBENT           26          0                                 O022502599999 
SUBENT        O0225026   19960918                             0000O022502600001 
BIB                  3          3                                 O022502600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502600004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022502600005 
ENDBIB               3          0                                 O022502600006 
COMMON               3          3                                 O022502600007 
E-EXC      ANG-ERR    DATA-ERR                                    O022502600008 
MEV        ADEG       PER-CENT                                    O022502600009 
      4.423        0.5         3.                                 O022502600010 
ENDCOMMON            3          0                                 O022502600011 
DATA                 2         19                                 O022502600012 
ANG-CM     DATA                                                   O022502600013 
ADEG       MB/SR                                                  O022502600014 
       24.6      0.349                                            O022502600015 
       28.1      0.384                                            O022502600016 
       29.5      0.385                                            O022502600017 
       33.1       0.39                                            O022502600018 
       36.6      0.486                                            O022502600019 
       40.1      0.488                                            O022502600020 
       43.7       0.49                                            O022502600021 
       47.3      0.492                                            O022502600022 
       52.7      0.362                                            O022502600023 
       56.8      0.291                                            O022502600024 
       64.2      0.153                                            O022502600025 
       69.3      0.132                                            O022502600026 
       72.8      0.133                                            O022502600027 
       76.4      0.122                                            O022502600028 
       82.3  0.858E-01                                            O022502600029 
       85.9  0.788E-01                                            O022502600030 
        91.  0.634E-01                                            O022502600031 
       93.3  0.444E-01                                            O022502600032 
       97.1  0.285E-01                                            O022502600033 
ENDDATA             21          0                                 O022502600034 
ENDSUBENT           33          0                                 O022502699999 
SUBENT        O0225027   19960918                             0000O022502700001 
BIB                  3          3                                 O022502700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022502700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502700005 
ENDBIB               3          0                                 O022502700006 
COMMON               2          3                                 O022502700007 
E-EXC      ANG-ERR                                                O022502700008 
MEV        ADEG                                                   O022502700009 
      4.444        0.5                                            O022502700010 
ENDCOMMON            3          0                                 O022502700011 
DATA                 3         10                                 O022502700012 
ANG-CM     DATA       ERR-T                                       O022502700013 
ADEG       MB/SR      PER-CENT                                    O022502700014 
       17.6    0.7E-02        40.                                 O022502700015 
       21.1    0.1E-01        30.                                 O022502700016 
        25.   0.98E-02        24.                                 O022502700017 
       31.7   0.14E-01        40.                                 O022502700018 
       37.3  0.164E-01        13.                                 O022502700019 
       47.8   0.49E-02        40.                                 O022502700020 
       59.8   0.31E-02        23.                                 O022502700021 
       65.4   0.25E-02        24.                                 O022502700022 
       70.4   0.15E-02        50.                                 O022502700023 
        96.    0.7E-03        40.                                 O022502700024 
ENDDATA             12          0                                 O022502700025 
ENDSUBENT           24          0                                 O022502799999 
SUBENT        O0225028   19960918                             0000O022502800001 
BIB                  3          3                                 O022502800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502800005 
ENDBIB               3          0                                 O022502800006 
COMMON               2          3                                 O022502800007 
E-EXC      ANG-ERR                                                O022502800008 
MEV        ADEG                                                   O022502800009 
      4.463        0.5                                            O022502800010 
ENDCOMMON            3          0                                 O022502800011 
DATA                 3          8                                 O022502800012 
ANG-CM     DATA       ERR-T                                       O022502800013 
ADEG       MB/SR      PER-CENT                                    O022502800014 
       19.9   0.15E-01        40.                                 O022502800015 
       23.5   0.14E-01        21.                                 O022502800016 
       38.5   0.46E-02        22.                                 O022502800017 
       41.2   0.53E-02        21.                                 O022502800018 
       52.2    0.3E-02        70.                                 O022502800019 
       68.5   0.18E-02        40.                                 O022502800020 
       74.5   0.17E-02        50.                                 O022502800021 
       102.    0.7E-03        40.                                 O022502800022 
ENDDATA             10          0                                 O022502800023 
ENDSUBENT           22          0                                 O022502899999 
SUBENT        O0225029   19960918                             0000O022502900001 
BIB                  3          4                                 O022502900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022502900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022502900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022502900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022502900006 
ENDBIB               4          0                                 O022502900007 
COMMON               3          3                                 O022502900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022502900009 
MEV        ADEG       PER-CENT                                    O022502900010 
      4.480        0.5        2.5                                 O022502900011 
ENDCOMMON            3          0                                 O022502900012 
DATA                 3         15                                 O022502900013 
ANG-CM     DATA       ERR-T                                       O022502900014 
ADEG       MB/SR      PER-CENT                                    O022502900015 
       15.5   0.55E-01        20.                                 O022502900016 
       18.3  0.372E-01                                            O022502900017 
       20.4   0.35E-01                                            O022502900018 
       24.9  0.584E-01                                            O022502900019 
       30.5  0.409E-01                                            O022502900020 
       36.3  0.476E-01                                            O022502900021 
       41.5  0.354E-01                                            O022502900022 
       43.1  0.279E-01                                            O022502900023 
       52.5  0.312E-01                                            O022502900024 
       64.1  0.282E-01                                            O022502900025 
       71.6  0.171E-01                                            O022502900026 
       75.1  0.171E-01        12.                                 O022502900027 
       82.7  0.205E-01                                            O022502900028 
        93.  0.183E-01                                            O022502900029 
      103.2   0.75E-02        12.                                 O022502900030 
ENDDATA             17          0                                 O022502900031 
ENDSUBENT           30          0                                 O022502999999 
SUBENT        O0225030   19960918                             0000O022503000001 
BIB                  3          3                                 O022503000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503000005 
ENDBIB               3          0                                 O022503000006 
COMMON               2          3                                 O022503000007 
E-EXC      ANG-ERR                                                O022503000008 
MEV        ADEG                                                   O022503000009 
      4.577        0.5                                            O022503000010 
ENDCOMMON            3          0                                 O022503000011 
DATA                 3         11                                 O022503000012 
ANG-CM     DATA       ERR-T                                       O022503000013 
ADEG       MB/SR      PER-CENT                                    O022503000014 
        25.   0.12E-01        60.                                 O022503000015 
       30.5   0.22E-01        14.                                 O022503000016 
       34.7   0.68E-02        30.                                 O022503000017 
       40.2   0.43E-02        60.                                 O022503000018 
       43.9    0.5E-02        40.                                 O022503000019 
       46.5   0.35E-02        29.                                 O022503000020 
       56.1   0.27E-02        40.                                 O022503000021 
       70.6   0.55E-02        18.                                 O022503000022 
       79.5   0.28E-02        40.                                 O022503000023 
       87.3   0.37E-02        22.                                 O022503000024 
       97.1   0.14E-02        40.                                 O022503000025 
ENDDATA             13          0                                 O022503000026 
ENDSUBENT           25          0                                 O022503099999 
SUBENT        O0225031   19960918                             0000O022503100001 
BIB                  3          4                                 O022503100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503100006 
ENDBIB               4          0                                 O022503100007 
COMMON               3          3                                 O022503100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503100009 
MEV        ADEG       PER-CENT                                    O022503100010 
      4.610        0.5        2.5                                 O022503100011 
ENDCOMMON            3          0                                 O022503100012 
DATA                 3         19                                 O022503100013 
ANG-CM     DATA       ERR-T                                       O022503100014 
ADEG       MB/SR      PER-CENT                                    O022503100015 
       27.4       0.17        24.                                 O022503100016 
       32.6     0.1351                                            O022503100017 
       36.4      0.182                                            O022503100018 
       39.9      0.157                                            O022503100019 
       43.5      0.148                                            O022503100020 
       48.5      0.153                                            O022503100021 
        55.      0.148                                            O022503100022 
       61.5      0.149                                            O022503100023 
       65.1      0.149                                            O022503100024 
       69.4     0.1363                                            O022503100025 
        74.     0.1178                                            O022503100026 
       77.7   0.84E-01                                            O022503100027 
       81.1  0.654E-01                                            O022503100028 
       84.4  0.396E-01                                            O022503100029 
       89.4  0.421E-01                                            O022503100030 
       96.4  0.296E-01                                            O022503100031 
      100.3  0.271E-01                                            O022503100032 
      103.4  0.218E-01                                            O022503100033 
      107.2  0.297E-01                                            O022503100034 
ENDDATA             21          0                                 O022503100035 
ENDSUBENT           34          0                                 O022503199999 
SUBENT        O0225032   19960918                             0000O022503200001 
BIB                  3          4                                 O022503200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503200006 
ENDBIB               4          0                                 O022503200007 
COMMON               3          3                                 O022503200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503200009 
MEV        ADEG       PER-CENT                                    O022503200010 
      4.680        0.5        2.5                                 O022503200011 
ENDCOMMON            3          0                                 O022503200012 
DATA                 3         11                                 O022503200013 
ANG-CM     DATA       ERR-T                                       O022503200014 
ADEG       MB/SR      PER-CENT                                    O022503200015 
       17.1   0.37E-01        30.                                 O022503200016 
       26.2   0.22E-01        27.                                 O022503200017 
       33.2    0.3E-01                                            O022503200018 
       38.7   0.32E-01        13.                                 O022503200019 
       44.5  0.204E-01         7.                                 O022503200020 
        69.   0.13E-01         5.                                 O022503200021 
       73.2 0.1088E-01                                            O022503200022 
       77.9   0.16E-01        19.                                 O022503200023 
       86.5  0.907E-02                                            O022503200024 
        96.   0.71E-02        14.                                 O022503200025 
      105.9    0.5E-02        12.                                 O022503200026 
ENDDATA             13          0                                 O022503200027 
ENDSUBENT           26          0                                 O022503299999 
SUBENT        O0225033   19960918                             0000O022503300001 
BIB                  3          4                                 O022503300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022503300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503300006 
ENDBIB               4          0                                 O022503300007 
COMMON               3          3                                 O022503300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503300009 
MEV        ADEG       PER-CENT                                    O022503300010 
      4.698        0.5         3.                                 O022503300011 
ENDCOMMON            3          0                                 O022503300012 
DATA                 3         13                                 O022503300013 
ANG-CM     DATA       ERR-T                                       O022503300014 
ADEG       MB/SR      PER-CENT                                    O022503300015 
       12.5      0.101        22.                                 O022503300016 
       13.9        0.1                                            O022503300017 
       26.4       0.35                                            O022503300018 
       34.7      0.312                                            O022503300019 
       40.3      0.106                                            O022503300020 
       41.6   0.78E-01                                            O022503300021 
       52.1      0.123                                            O022503300022 
       65.9   0.89E-01                                            O022503300023 
       69.4   0.72E-01                                            O022503300024 
       72.9  0.826E-01                                            O022503300025 
       81.9  0.674E-01                                            O022503300026 
       90.2  0.251E-01                                            O022503300027 
      100.6   0.78E-02        10.                                 O022503300028 
ENDDATA             15          0                                 O022503300029 
ENDSUBENT           28          0                                 O022503399999 
SUBENT        O0225034   19960918                             0000O022503400001 
BIB                  3          4                                 O022503400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503400006 
ENDBIB               4          0                                 O022503400007 
COMMON               3          3                                 O022503400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503400009 
MEV        ADEG       PER-CENT                                    O022503400010 
      4.711        0.5        2.5                                 O022503400011 
ENDCOMMON            3          0                                 O022503400012 
DATA                 3         12                                 O022503400013 
ANG-CM     DATA       ERR-T                                       O022503400014 
ADEG       MB/SR      PER-CENT                                    O022503400015 
       10.3   0.78E-01        28.                                 O022503400016 
        12.      0.119                                            O022503400017 
       22.7      0.126                                            O022503400018 
        28.  0.891E-01                                            O022503400019 
       31.9      0.126                                            O022503400020 
       36.8     0.1264                                            O022503400021 
       61.6  0.343E-01                                            O022503400022 
       67.3  0.459E-01                                            O022503400023 
       74.4  0.297E-01                                            O022503400024 
       78.3 0.1241E-01                                            O022503400025 
       88.5   0.52E-02        17.                                 O022503400026 
      100.6 0.1176E-01                                            O022503400027 
ENDDATA             14          0                                 O022503400028 
ENDSUBENT           27          0                                 O022503499999 
SUBENT        O0225035   19960918                             0000O022503500001 
BIB                  3          4                                 O022503500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503500006 
ENDBIB               4          0                                 O022503500007 
COMMON               3          3                                 O022503500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503500009 
MEV        ADEG       PER-CENT                                    O022503500010 
      4.762        0.5         3.                                 O022503500011 
ENDCOMMON            3          0                                 O022503500012 
DATA                 3         12                                 O022503500013 
ANG-CM     DATA       ERR-T                                       O022503500014 
ADEG       MB/SR      PER-CENT                                    O022503500015 
       12.7    0.4E-01        30.                                 O022503500016 
       23.4   0.32E-01        22.                                 O022503500017 
       26.9   0.32E-01                                            O022503500018 
       34.1  0.398E-01                                            O022503500019 
       37.6  0.316E-01                                            O022503500020 
       41.1    0.2E-01                                            O022503500021 
       51.8   0.25E-01                                            O022503500022 
       62.4  0.158E-01                                            O022503500023 
       69.4   0.79E-02                                            O022503500024 
       72.9   0.71E-02        30.                                 O022503500025 
        80.   0.63E-02        13.                                 O022503500026 
       97.8    0.5E-02        22.                                 O022503500027 
ENDDATA             14          0                                 O022503500028 
ENDSUBENT           27          0                                 O022503599999 
SUBENT        O0225036   19960918                             0000O022503600001 
BIB                  3          4                                 O022503600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.2   O022503600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503600006 
ENDBIB               4          0                                 O022503600007 
COMMON               3          3                                 O022503600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503600009 
MEV        ADEG       PER-CENT                                    O022503600010 
      4.841        0.5         3.                                 O022503600011 
ENDCOMMON            3          0                                 O022503600012 
DATA                 3         13                                 O022503600013 
ANG-CM     DATA       ERR-T                                       O022503600014 
ADEG       MB/SR      PER-CENT                                    O022503600015 
        7.5       1.57                                            O022503600016 
       12.8       0.98                                            O022503600017 
       16.5      0.562                                            O022503600018 
       26.3   0.88E-01                                            O022503600019 
       31.5      0.121                                            O022503600020 
       35.3       0.12                                            O022503600021 
        39.  0.688E-01                                            O022503600022 
       49.2  0.679E-01                                            O022503600023 
       61.6  0.146E-01                                            O022503600024 
       67.6  0.205E-01                                            O022503600025 
       71.7   0.33E-01                                            O022503600026 
       80.3  0.164E-01                                            O022503600027 
       90.1  0.141E-01        18.                                 O022503600028 
ENDDATA             15          0                                 O022503600029 
ENDSUBENT           28          0                                 O022503699999 
SUBENT        O0225037   19960918                             0000O022503700001 
BIB                  3          4                                 O022503700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503700006 
ENDBIB               4          0                                 O022503700007 
COMMON               3          3                                 O022503700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503700009 
MEV        ADEG       PER-CENT                                    O022503700010 
      4.863        0.5        2.5                                 O022503700011 
ENDCOMMON            3          0                                 O022503700012 
DATA                 3         14                                 O022503700013 
ANG-CM     DATA       ERR-T                                       O022503700014 
ADEG       MB/SR      PER-CENT                                    O022503700015 
       10.6   0.56E-01        30.                                 O022503700016 
        12.   0.61E-01        15.                                 O022503700017 
       17.7  0.561E-01                                            O022503700018 
       28.3  0.651E-01                                            O022503700019 
       33.3   0.48E-01                                            O022503700020 
       35.4  0.621E-01                                            O022503700021 
       40.4   0.65E-01                                            O022503700022 
        51.  0.479E-01                                            O022503700023 
       61.6   0.42E-01                                            O022503700024 
       67.3  0.353E-01                                            O022503700025 
       72.2  0.386E-01                                            O022503700026 
       79.3  0.181E-01                                            O022503700027 
       89.9    0.9E-02        23.                                 O022503700028 
      100.6  0.105E-01                                            O022503700029 
ENDDATA             16          0                                 O022503700030 
ENDSUBENT           29          0                                 O022503799999 
SUBENT        O0225038   19960918                             0000O022503800001 
BIB                  3          4                                 O022503800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503800006 
ENDBIB               4          0                                 O022503800007 
COMMON               3          3                                 O022503800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503800009 
MEV        ADEG       PER-CENT                                    O022503800010 
      4.895        0.5        2.5                                 O022503800011 
ENDCOMMON            3          0                                 O022503800012 
DATA                 3         14                                 O022503800013 
ANG-CM     DATA       ERR-T                                       O022503800014 
ADEG       MB/SR      PER-CENT                                    O022503800015 
        12.   0.48E-01        23.                                 O022503800016 
        13.   0.64E-01        17.                                 O022503800017 
       17.7  0.617E-01                                            O022503800018 
       28.3  0.532E-01                                            O022503800019 
       33.3  0.532E-01                                            O022503800020 
        39.  0.402E-01                                            O022503800021 
       40.4  0.396E-01                                            O022503800022 
        51.  0.487E-01                                            O022503800023 
       63.7  0.313E-01                                            O022503800024 
       68.7  0.313E-01                                            O022503800025 
       72.2  0.254E-01                                            O022503800026 
       79.3  0.313E-01                                            O022503800027 
       89.9  0.201E-01                                            O022503800028 
      100.6  0.161E-01                                            O022503800029 
ENDDATA             16          0                                 O022503800030 
ENDSUBENT           29          0                                 O022503899999 
SUBENT        O0225039   19960918                             0000O022503900001 
BIB                  3          4                                 O022503900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022503900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022503900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022503900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022503900006 
ENDBIB               4          0                                 O022503900007 
COMMON               3          3                                 O022503900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022503900009 
MEV        ADEG       PER-CENT                                    O022503900010 
      4.917        0.5        2.5                                 O022503900011 
ENDCOMMON            3          0                                 O022503900012 
DATA                 3         12                                 O022503900013 
ANG-CM     DATA       ERR-T                                       O022503900014 
ADEG       MB/SR      PER-CENT                                    O022503900015 
       13.1   0.33E-01        40.                                 O022503900016 
       17.4   0.43E-01        12.                                 O022503900017 
       28.3  0.372E-01                                            O022503900018 
       33.3  0.372E-01                                            O022503900019 
       37.5  0.322E-01                                            O022503900020 
       40.4   0.24E-01                                            O022503900021 
       62.3  0.207E-01                                            O022503900022 
       68.7  0.184E-01                                            O022503900023 
       72.2  0.102E-01        21.                                 O022503900024 
        80.  0.169E-01                                            O022503900025 
       91.7  0.858E-02                                            O022503900026 
      100.9    0.6E-02        18.                                 O022503900027 
ENDDATA             14          0                                 O022503900028 
ENDSUBENT           27          0                                 O022503999999 
SUBENT        O0225040   19960918                             0000O022504000001 
BIB                  3          4                                 O022504000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022504000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504000006 
ENDBIB               4          0                                 O022504000007 
COMMON               3          3                                 O022504000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504000009 
MEV        ADEG       PER-CENT                                    O022504000010 
      4.933        0.5        2.5                                 O022504000011 
ENDCOMMON            3          0                                 O022504000012 
DATA                 3         13                                 O022504000013 
ANG-CM     DATA       ERR-T                                       O022504000014 
ADEG       MB/SR      PER-CENT                                    O022504000015 
       10.6   0.56E-01        40.                                 O022504000016 
        12.   0.51E-01        27.                                 O022504000017 
       17.7      0.118                                            O022504000018 
       28.3      0.146                                            O022504000019 
       33.3      0.108                                            O022504000020 
        39.  0.592E-01                                            O022504000021 
       39.7  0.305E-01                                            O022504000022 
       63.4  0.406E-01                                            O022504000023 
       68.7  0.412E-01                                            O022504000024 
        74.  0.279E-01                                            O022504000025 
        80.  0.206E-01                                            O022504000026 
       91.7  0.152E-01                                            O022504000027 
      100.6   0.62E-02        13.                                 O022504000028 
ENDDATA             15          0                                 O022504000029 
ENDSUBENT           28          0                                 O022504099999 
SUBENT        O0225041   19960918                             0000O022504100001 
BIB                  3          4                                 O022504100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.2    O022504100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504100006 
ENDBIB               4          0                                 O022504100007 
COMMON               3          3                                 O022504100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504100009 
MEV        ADEG       PER-CENT                                    O022504100010 
      4.954        0.5        2.5                                 O022504100011 
ENDCOMMON            3          0                                 O022504100012 
DATA                 3         13                                 O022504100013 
ANG-CM     DATA       ERR-T                                       O022504100014 
ADEG       MB/SR      PER-CENT                                    O022504100015 
       10.6   0.21E-01        50.                                 O022504100016 
        12.   0.32E-01        28.                                 O022504100017 
       17.7  0.958E-01                                            O022504100018 
       28.3  0.869E-01                                            O022504100019 
       33.3  0.748E-01                                            O022504100020 
        39.  0.338E-01                                            O022504100021 
       49.6  0.519E-01                                            O022504100022 
       63.7   0.21E-01                                            O022504100023 
       68.7  0.215E-01                                            O022504100024 
       72.2  0.137E-01        18.                                 O022504100025 
       81.4  0.124E-01                                            O022504100026 
       92.1    0.7E-02                                            O022504100027 
      100.6   0.44E-02        18.                                 O022504100028 
ENDDATA             15          0                                 O022504100029 
ENDSUBENT           28          0                                 O022504199999 
SUBENT        O0225042   19960918                             0000O022504200001 
BIB                  3          4                                 O022504200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504200006 
ENDBIB               4          0                                 O022504200007 
COMMON               3          3                                 O022504200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504200009 
MEV        ADEG       PER-CENT                                    O022504200010 
      4.973        0.5        1.4                                 O022504200011 
ENDCOMMON            3          0                                 O022504200012 
DATA                 3         12                                 O022504200013 
ANG-CM     DATA       ERR-T                                       O022504200014 
ADEG       MB/SR      PER-CENT                                    O022504200015 
        8.8      0.177        10.                                 O022504200016 
       12.9     0.1602                                            O022504200017 
       17.7      0.242                                            O022504200018 
       27.8      0.172                                            O022504200019 
        32.   0.93E-01                                            O022504200020 
       37.2  0.585E-01                                            O022504200021 
       48.3  0.421E-01                                            O022504200022 
       62.2  0.597E-01                                            O022504200023 
       66.8  0.397E-01                                            O022504200024 
       78.6 0.1877E-01                                            O022504200025 
       88.6 0.1541E-01                                            O022504200026 
       98.8   0.38E-02        21.                                 O022504200027 
ENDDATA             14          0                                 O022504200028 
ENDSUBENT           27          0                                 O022504299999 
SUBENT        O0225043   19960918                             0000O022504300001 
BIB                  3          4                                 O022504300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504300006 
ENDBIB               4          0                                 O022504300007 
COMMON               3          3                                 O022504300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504300009 
MEV        ADEG       PER-CENT                                    O022504300010 
      4.991        0.4        1.4                                 O022504300011 
ENDCOMMON            3          0                                 O022504300012 
DATA                 3         10                                 O022504300013 
ANG-CM     DATA       ERR-T                                       O022504300014 
ADEG       MB/SR      PER-CENT                                    O022504300015 
        12.       0.11        50.                                 O022504300016 
       16.9       0.15        40.                                 O022504300017 
       35.9     0.1374                                            O022504300018 
       49.2       0.22        18.                                 O022504300019 
       61.8      0.194                                            O022504300020 
        66.  0.991E-01                                            O022504300021 
       71.8       0.19        16.                                 O022504300022 
       79.2     0.1026                                            O022504300023 
       88.8   0.37E-01        19.                                 O022504300024 
        98.    0.2E-01        30.                                 O022504300025 
ENDDATA             12          0                                 O022504300026 
ENDSUBENT           25          0                                 O022504399999 
SUBENT        O0225044   19960918                             0000O022504400001 
BIB                  3          4                                 O022504400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504400006 
ENDBIB               4          0                                 O022504400007 
COMMON               3          3                                 O022504400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504400009 
MEV        ADEG       PER-CENT                                    O022504400010 
      5.010        0.4        2.5                                 O022504400011 
ENDCOMMON            3          0                                 O022504400012 
DATA                 3          9                                 O022504400013 
ANG-CM     DATA       ERR-T                                       O022504400014 
ADEG       MB/SR      PER-CENT                                    O022504400015 
       17.2    0.2E-01        40.                                 O022504400016 
       36.3   0.15E-01                                            O022504400017 
       38.8  0.182E-01                                            O022504400018 
       49.4   0.11E-01        27.                                 O022504400019 
       61.8  0.162E-01                                            O022504400020 
       66.4  0.121E-01                                            O022504400021 
       70.9  0.132E-01        17.                                 O022504400022 
       88.9   0.53E-02        10.                                 O022504400023 
       98.7   0.51E-02         8.                                 O022504400024 
ENDDATA             11          0                                 O022504400025 
ENDSUBENT           24          0                                 O022504499999 
SUBENT        O0225045   19960918                             0000O022504500001 
BIB                  3          4                                 O022504500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504500006 
ENDBIB               4          0                                 O022504500007 
COMMON               3          3                                 O022504500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504500009 
MEV        ADEG       PER-CENT                                    O022504500010 
      5.036        0.5         3.                                 O022504500011 
ENDCOMMON            3          0                                 O022504500012 
DATA                 3         13                                 O022504500013 
ANG-CM     DATA       ERR-T                                       O022504500014 
ADEG       MB/SR      PER-CENT                                    O022504500015 
        7.3   0.98E-01        28.                                 O022504500016 
       10.5      0.119                                            O022504500017 
       15.9      0.163                                            O022504500018 
       31.5  0.396E-01                                            O022504500019 
       37.9  0.393E-01                                            O022504500020 
       39.1  0.191E-01                                            O022504500021 
       48.7   0.26E-01        10.                                 O022504500022 
       61.4  0.175E-01                                            O022504500023 
       66.5  0.115E-01                                            O022504500024 
       72.9   0.62E-02        30.                                 O022504500025 
       80.5  0.756E-02                                            O022504500026 
        90.   0.44E-02        16.                                 O022504500027 
      102.8   0.29E-02        24.                                 O022504500028 
ENDDATA             15          0                                 O022504500029 
ENDSUBENT           28          0                                 O022504599999 
SUBENT        O0225046   19960918                             0000O022504600001 
BIB                  3          3                                 O022504600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504600004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022504600005 
ENDBIB               3          0                                 O022504600006 
COMMON               3          3                                 O022504600007 
E-EXC      ANG-ERR    DATA-ERR                                    O022504600008 
MEV        ADEG       PER-CENT                                    O022504600009 
      5.072        0.4        1.4                                 O022504600010 
ENDCOMMON            3          0                                 O022504600011 
DATA                 2         12                                 O022504600012 
ANG-CM     DATA                                                   O022504600013 
ADEG       MB/SR                                                  O022504600014 
        9.4      0.181                                            O022504600015 
        11.     0.1071                                            O022504600016 
       16.9      0.148                                            O022504600017 
       31.9     0.1491                                            O022504600018 
       37.5     0.1046                                            O022504600019 
       47.7  0.622E-01                                            O022504600020 
       59.7  0.727E-01                                            O022504600021 
       65.4   0.73E-01                                            O022504600022 
       71.2  0.733E-01                                            O022504600023 
        79.  0.285E-01                                            O022504600024 
        88.  0.237E-01                                            O022504600025 
       98.2 0.1193E-01                                            O022504600026 
ENDDATA             14          0                                 O022504600027 
ENDSUBENT           26          0                                 O022504699999 
SUBENT        O0225047   19960918                             0000O022504700001 
BIB                  3          4                                 O022504700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504700006 
ENDBIB               4          0                                 O022504700007 
COMMON               3          3                                 O022504700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504700009 
MEV        ADEG       PER-CENT                                    O022504700010 
      5.087        0.4        2.5                                 O022504700011 
ENDCOMMON            3          0                                 O022504700012 
DATA                 3         14                                 O022504700013 
ANG-CM     DATA       ERR-T                                       O022504700014 
ADEG       MB/SR      PER-CENT                                    O022504700015 
         2.      0.152        13.                                 O022504700016 
        6.3      0.152                                            O022504700017 
        10.      0.261                                            O022504700018 
       25.4      0.115                                            O022504700019 
       29.8     0.1088                                            O022504700020 
        34.     0.1148                                            O022504700021 
       42.3      0.137                                            O022504700022 
       56.3   0.47E-01                                            O022504700023 
       61.4  0.214E-01                                            O022504700024 
       64.3  0.161E-01                                            O022504700025 
       67.8  0.329E-01                                            O022504700026 
       73.4  0.471E-01                                            O022504700027 
        85.  0.307E-01                                            O022504700028 
       95.8  0.193E-01                                            O022504700029 
ENDDATA             16          0                                 O022504700030 
ENDSUBENT           29          0                                 O022504799999 
SUBENT        O0225048   19960918                             0000O022504800001 
BIB                  3          4                                 O022504800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022504800006 
ENDBIB               4          0                                 O022504800007 
COMMON               3          3                                 O022504800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022504800009 
MEV        ADEG       PER-CENT                                    O022504800010 
      5.128        0.4        2.5                                 O022504800011 
ENDCOMMON            3          0                                 O022504800012 
DATA                 3         14                                 O022504800013 
ANG-CM     DATA       ERR-T                                       O022504800014 
ADEG       MB/SR      PER-CENT                                    O022504800015 
        5.2      0.144        11.                                 O022504800016 
        7.4   0.85E-01        16.                                 O022504800017 
       14.2   0.94E-01                                            O022504800018 
       24.7  0.709E-01                                            O022504800019 
       29.9  0.326E-01                                            O022504800020 
       35.2  0.121E-01        13.                                 O022504800021 
       35.5   0.94E-02        19.                                 O022504800022 
       46.5  0.101E-01        30.                                 O022504800023 
       60.9  0.121E-01         8.                                 O022504800024 
       65.2  0.113E-01                                            O022504800025 
        70.   0.71E-02        20.                                 O022504800026 
       78.4   0.85E-02                                            O022504800027 
       87.7   0.42E-02        14.                                 O022504800028 
       98.7   0.47E-02        17.                                 O022504800029 
ENDDATA             16          0                                 O022504800030 
ENDSUBENT           29          0                                 O022504899999 
SUBENT        O0225049   19960918                             0000O022504900001 
BIB                  3          3                                 O022504900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022504900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022504900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022504900005 
ENDBIB               3          0                                 O022504900006 
COMMON               2          3                                 O022504900007 
E-EXC      ANG-ERR                                                O022504900008 
MEV        ADEG                                                   O022504900009 
      5.163        0.6                                            O022504900010 
ENDCOMMON            3          0                                 O022504900011 
DATA                 3         13                                 O022504900012 
ANG-CM     DATA       ERR-T                                       O022504900013 
ADEG       MB/SR      PER-CENT                                    O022504900014 
        9.3    0.9E-02        30.                                 O022504900015 
        16.   0.11E-01        50.                                 O022504900016 
       25.8  0.168E-01        16.                                 O022504900017 
       30.6   0.99E-02        25.                                 O022504900018 
       33.1   0.11E-01        19.                                 O022504900019 
       37.5    0.9E-02        70.                                 O022504900020 
       38.3   0.46E-02        30.                                 O022504900021 
       48.2    0.6E-02        50.                                 O022504900022 
       61.5   0.42E-02        30.                                 O022504900023 
       65.6   0.51E-02        14.                                 O022504900024 
       71.5   0.81E-02        25.                                 O022504900025 
       78.7    0.4E-02        17.                                 O022504900026 
       99.7   0.59E-02        30.                                 O022504900027 
ENDDATA             15          0                                 O022504900028 
ENDSUBENT           27          0                                 O022504999999 
SUBENT        O0225050   19960918                             0000O022505000001 
BIB                  3          4                                 O022505000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505000006 
ENDBIB               4          0                                 O022505000007 
COMMON               3          3                                 O022505000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505000009 
MEV        ADEG       PER-CENT                                    O022505000010 
      5.194        0.4        1.5                                 O022505000011 
ENDCOMMON            3          0                                 O022505000012 
DATA                 3         11                                 O022505000013 
ANG-CM     DATA       ERR-T                                       O022505000014 
ADEG       MB/SR      PER-CENT                                    O022505000015 
       18.5   0.54E-01                                            O022505000016 
       27.5   0.47E-01                                            O022505000017 
       32.4  0.427E-01                                            O022505000018 
       38.4  0.249E-01                                            O022505000019 
       40.6   0.29E-01                                            O022505000020 
       50.7  0.269E-01                                            O022505000021 
       63.8   0.25E-01                                            O022505000022 
       68.2   0.15E-01                                            O022505000023 
       72.9    0.5E-02        40.                                 O022505000024 
       81.2 0.1119E-01                                            O022505000025 
      100.6   0.87E-02        24.                                 O022505000026 
ENDDATA             13          0                                 O022505000027 
ENDSUBENT           26          0                                 O022505099999 
SUBENT        O0225051   19960918                             0000O022505100001 
BIB                  3          4                                 O022505100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505100006 
ENDBIB               4          0                                 O022505100007 
COMMON               3          3                                 O022505100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505100009 
MEV        ADEG       PER-CENT                                    O022505100010 
      5.214        0.4        1.5                                 O022505100011 
ENDCOMMON            3          0                                 O022505100012 
DATA                 3         12                                 O022505100013 
ANG-CM     DATA       ERR-T                                       O022505100014 
ADEG       MB/SR      PER-CENT                                    O022505100015 
        8.1      0.129        18.                                 O022505100016 
       11.6      0.128                                            O022505100017 
       18.1       0.11                                            O022505100018 
       28.1     0.1635                                            O022505100019 
       36.6     0.1084                                            O022505100020 
       41.6      0.123                                            O022505100021 
       51.5   0.96E-01                                            O022505100022 
       63.2  0.583E-01                                            O022505100023 
       67.9  0.523E-01                                            O022505100024 
       72.9  0.345E-01                                            O022505100025 
       81.4  0.341E-01                                            O022505100026 
      101.2  0.146E-01        10.                                 O022505100027 
ENDDATA             14          0                                 O022505100028 
ENDSUBENT           27          0                                 O022505199999 
SUBENT        O0225052   19960918                             0000O022505200001 
BIB                  3          4                                 O022505200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505200006 
ENDBIB               4          0                                 O022505200007 
COMMON               3          3                                 O022505200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505200009 
MEV        ADEG       PER-CENT                                    O022505200010 
      5.242        0.4        1.5                                 O022505200011 
ENDCOMMON            3          0                                 O022505200012 
DATA                 3         12                                 O022505200013 
ANG-CM     DATA       ERR-T                                       O022505200014 
ADEG       MB/SR      PER-CENT                                    O022505200015 
       10.7      0.153        12.                                 O022505200016 
       13.4       0.14                                            O022505200017 
       18.1      0.167                                            O022505200018 
       28.3     0.1449                                            O022505200019 
        38.  0.934E-01                                            O022505200020 
        42.     0.1678                                            O022505200021 
       51.9  0.738E-01                                            O022505200022 
       62.9  0.403E-01                                            O022505200023 
       67.9  0.409E-01                                            O022505200024 
       73.2  0.336E-01                                            O022505200025 
       80.6  0.343E-01                                            O022505200026 
      102.2  0.135E-01                                            O022505200027 
ENDDATA             14          0                                 O022505200028 
ENDSUBENT           27          0                                 O022505299999 
SUBENT        O0225053   19960918                             0000O022505300001 
BIB                  3          4                                 O022505300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505300006 
ENDBIB               4          0                                 O022505300007 
COMMON               3          3                                 O022505300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505300009 
MEV        ADEG       PER-CENT                                    O022505300010 
      5.274        0.6         3.                                 O022505300011 
ENDCOMMON            3          0                                 O022505300012 
DATA                 3         10                                 O022505300013 
ANG-CM     DATA       ERR-T                                       O022505300014 
ADEG       MB/SR      PER-CENT                                    O022505300015 
        8.3   0.31E-01        50.                                 O022505300016 
       10.9   0.54E-01        17.                                 O022505300017 
       16.8  0.582E-01                                            O022505300018 
       27.5  0.235E-01                                            O022505300019 
       36.7  0.183E-01        13.                                 O022505300020 
       61.2   0.89E-02        22.                                 O022505300021 
       65.8   0.96E-02                                            O022505300022 
       72.1    0.8E-02        25.                                 O022505300023 
        80.   0.74E-02        12.                                 O022505300024 
       99.9   0.28E-02        25.                                 O022505300025 
ENDDATA             12          0                                 O022505300026 
ENDSUBENT           25          0                                 O022505399999 
SUBENT        O0225054   19960918                             0000O022505400001 
BIB                  3          4                                 O022505400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505400006 
ENDBIB               4          0                                 O022505400007 
COMMON               3          3                                 O022505400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505400009 
MEV        ADEG       PER-CENT                                    O022505400010 
      5.291        0.5         3.                                 O022505400011 
ENDCOMMON            3          0                                 O022505400012 
DATA                 3          9                                 O022505400013 
ANG-CM     DATA       ERR-T                                       O022505400014 
ADEG       MB/SR      PER-CENT                                    O022505400015 
       10.1      0.287                                            O022505400016 
       13.8      0.229                                            O022505400017 
       17.6        0.2                                            O022505400018 
       39.9  0.512E-01                                            O022505400019 
        51.  0.297E-01                                            O022505400020 
       68.4  0.259E-01                                            O022505400021 
       73.6   0.21E-01        19.                                 O022505400022 
       81.1  0.189E-01                                            O022505400023 
       102.   0.67E-02        10.                                 O022505400024 
ENDDATA             11          0                                 O022505400025 
ENDSUBENT           24          0                                 O022505499999 
SUBENT        O0225055   19960918                             0000O022505500001 
BIB                  3          4                                 O022505500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505500006 
ENDBIB               4          0                                 O022505500007 
COMMON               3          3                                 O022505500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505500009 
MEV        ADEG       PER-CENT                                    O022505500010 
      5.321        0.6         3.                                 O022505500011 
ENDCOMMON            3          0                                 O022505500012 
DATA                 3         12                                 O022505500013 
ANG-CM     DATA       ERR-T                                       O022505500014 
ADEG       MB/SR      PER-CENT                                    O022505500015 
       15.4   0.66E-01        25.                                 O022505500016 
       19.7   0.46E-01        13.                                 O022505500017 
        24.   0.87E-01                                            O022505500018 
       45.4  0.311E-01                                            O022505500019 
       47.1  0.244E-01                                            O022505500020 
       58.3  0.353E-01                                            O022505500021 
       68.6  0.227E-01                                            O022505500022 
       72.9  0.161E-01                                            O022505500023 
       77.1    0.8E-02        20.                                 O022505500024 
       87.9  0.116E-01                                            O022505500025 
       98.6  0.156E-01                                            O022505500026 
      107.1   0.55E-02        15.                                 O022505500027 
ENDDATA             14          0                                 O022505500028 
ENDSUBENT           27          0                                 O022505599999 
SUBENT        O0225056   19960918                             0000O022505600001 
BIB                  3          4                                 O022505600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505600006 
ENDBIB               4          0                                 O022505600007 
COMMON               3          3                                 O022505600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505600009 
MEV        ADEG       PER-CENT                                    O022505600010 
      5.345        0.6         3.                                 O022505600011 
ENDCOMMON            3          0                                 O022505600012 
DATA                 3         14                                 O022505600013 
ANG-CM     DATA       ERR-T                                       O022505600014 
ADEG       MB/SR      PER-CENT                                    O022505600015 
       12.9      0.142        18.                                 O022505600016 
       15.9      0.135                                            O022505600017 
       21.4      0.202                                            O022505600018 
        30.      0.242                                            O022505600019 
       38.6      0.172                                            O022505600020 
       41.1      0.122                                            O022505600021 
       42.9      0.122                                            O022505600022 
       55.7      0.146                                            O022505600023 
       66.9      0.115                                            O022505600024 
       71.1   0.74E-01                                            O022505600025 
       77.1   0.62E-01                                            O022505600026 
        84.  0.497E-01                                            O022505600027 
       94.3   0.41E-01                                            O022505600028 
      102.9  0.222E-01                                            O022505600029 
ENDDATA             16          0                                 O022505600030 
ENDSUBENT           29          0                                 O022505699999 
SUBENT        O0225057   19960918                             0000O022505700001 
BIB                  3          4                                 O022505700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505700006 
ENDBIB               4          0                                 O022505700007 
COMMON               3          3                                 O022505700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505700009 
MEV        ADEG       PER-CENT                                    O022505700010 
      5.370        0.6         3.                                 O022505700011 
ENDCOMMON            3          0                                 O022505700012 
DATA                 3          9                                 O022505700013 
ANG-CM     DATA       ERR-T                                       O022505700014 
ADEG       MB/SR      PER-CENT                                    O022505700015 
       17.1   0.22E-01        23.                                 O022505700016 
       34.3   0.34E-01                                            O022505700017 
       41.1   0.34E-01                                            O022505700018 
       51.4  0.202E-01        11.                                 O022505700019 
       64.3  0.169E-01                                            O022505700020 
       68.6   0.12E-01                                            O022505700021 
       81.4   0.85E-02                                            O022505700022 
       92.6    0.5E-02                                            O022505700023 
      102.9   0.25E-02        20.                                 O022505700024 
ENDDATA             11          0                                 O022505700025 
ENDSUBENT           24          0                                 O022505799999 
SUBENT        O0225058   19960918                             0000O022505800001 
BIB                  3          4                                 O022505800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022505800006 
ENDBIB               4          0                                 O022505800007 
COMMON               3          3                                 O022505800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022505800009 
MEV        ADEG       PER-CENT                                    O022505800010 
      5.383        0.4        1.5                                 O022505800011 
ENDCOMMON            3          0                                 O022505800012 
DATA                 3         11                                 O022505800013 
ANG-CM     DATA       ERR-T                                       O022505800014 
ADEG       MB/SR      PER-CENT                                    O022505800015 
        13.   0.81E-01        10.                                 O022505800016 
       17.6     0.1152                                            O022505800017 
        28.  0.949E-01                                            O022505800018 
       33.9        0.1                                            O022505800019 
       40.2  0.651E-01                                            O022505800020 
       50.6  0.609E-01                                            O022505800021 
       63.7  0.305E-01                                            O022505800022 
       67.7  0.148E-01                                            O022505800023 
       73.3  0.105E-01        24.                                 O022505800024 
        80.  0.986E-02                                            O022505800025 
      100.6    0.2E-02        30.                                 O022505800026 
ENDDATA             13          0                                 O022505800027 
ENDSUBENT           26          0                                 O022505899999 
SUBENT        O0225059   19960918                             0000O022505900001 
BIB                  3          3                                 O022505900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022505900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022505900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022505900005 
ENDBIB               3          0                                 O022505900006 
COMMON               2          3                                 O022505900007 
E-EXC      ANG-ERR                                                O022505900008 
MEV        ADEG                                                   O022505900009 
      5.417        0.4                                            O022505900010 
ENDCOMMON            3          0                                 O022505900011 
DATA                 3         12                                 O022505900012 
ANG-CM     DATA       ERR-T                                       O022505900013 
ADEG       MB/SR      PER-CENT                                    O022505900014 
        13.   0.13E-01        70.                                 O022505900015 
       18.2   0.23E-01        26.                                 O022505900016 
       28.4  0.126E-01        19.                                 O022505900017 
       32.8   0.15E-01        27.                                 O022505900018 
       37.3  0.217E-01        12.                                 O022505900019 
       40.6   0.24E-01        17.                                 O022505900020 
       63.1  0.139E-01        14.                                 O022505900021 
       67.9   0.76E-02        14.                                 O022505900022 
       74.1   0.77E-02        25.                                 O022505900023 
       81.5   0.43E-02        19.                                 O022505900024 
        91.   0.29E-02        24.                                 O022505900025 
      101.5   0.26E-02        23.                                 O022505900026 
ENDDATA             14          0                                 O022505900027 
ENDSUBENT           26          0                                 O022505999999 
SUBENT        O0225060   19960918                             0000O022506000001 
BIB                  3          3                                 O022506000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506000005 
ENDBIB               3          0                                 O022506000006 
COMMON               2          3                                 O022506000007 
E-EXC      ANG-ERR                                                O022506000008 
MEV        ADEG                                                   O022506000009 
      5.444        0.4                                            O022506000010 
ENDCOMMON            3          0                                 O022506000011 
DATA                 3          9                                 O022506000012 
ANG-CM     DATA       ERR-T                                       O022506000013 
ADEG       MB/SR      PER-CENT                                    O022506000014 
       12.4   0.23E-01        80.                                 O022506000015 
       19.4   0.18E-01        30.                                 O022506000016 
       30.3   0.53E-02        30.                                 O022506000017 
       34.8   0.66E-02        40.                                 O022506000018 
       42.1   0.74E-02        23.                                 O022506000019 
        75.   0.58E-02        29.                                 O022506000020 
       82.8   0.27E-02        22.                                 O022506000021 
       92.9    0.8E-03        50.                                 O022506000022 
      102.6   0.15E-02        30.                                 O022506000023 
ENDDATA             11          0                                 O022506000024 
ENDSUBENT           23          0                                 O022506099999 
SUBENT        O0225061   19960918                             0000O022506100001 
BIB                  3          3                                 O022506100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)               O022506100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506100004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022506100005 
ENDBIB               3          0                                 O022506100006 
COMMON               3          3                                 O022506100007 
E-EXC      ANG-ERR    DATA-ERR                                    O022506100008 
MEV        ADEG       PER-CENT                                    O022506100009 
      5.483        0.4        1.5                                 O022506100010 
ENDCOMMON            3          0                                 O022506100011 
DATA                 2         13                                 O022506100012 
ANG-CM     DATA                                                   O022506100013 
ADEG       MB/SR                                                  O022506100014 
       12.9  0.251E-01                                            O022506100015 
       16.4 0.1526E-01                                            O022506100016 
       21.4  0.245E-01                                            O022506100017 
       30.7   0.19E-01                                            O022506100018 
       36.7  0.254E-01                                            O022506100019 
       43.9  0.249E-01                                            O022506100020 
       53.9  0.864E-02                                            O022506100021 
       66.7  0.109E-01                                            O022506100022 
       71.6   0.11E-01                                            O022506100023 
        78.    0.9E-02                                            O022506100024 
       83.4  0.488E-02                                            O022506100025 
       93.6   0.24E-02                                            O022506100026 
      105.5 0.1289E-02                                            O022506100027 
ENDDATA             15          0                                 O022506100028 
ENDSUBENT           27          0                                 O022506199999 
SUBENT        O0225062   19960918                             0000O022506200001 
BIB                  3          4                                 O022506200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)               O022506200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506200006 
ENDBIB               4          0                                 O022506200007 
COMMON               3          3                                 O022506200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506200009 
MEV        ADEG       PER-CENT                                    O022506200010 
      5.514        0.6         3.                                 O022506200011 
ENDCOMMON            3          0                                 O022506200012 
DATA                 3         13                                 O022506200013 
ANG-CM     DATA       ERR-T                                       O022506200014 
ADEG       MB/SR      PER-CENT                                    O022506200015 
        4.8       1.89                                            O022506200016 
        9.5      1.004                                            O022506200017 
       14.1       0.59                                            O022506200018 
       22.6      0.551                                            O022506200019 
       29.4      0.591                                            O022506200020 
       38.6      0.205                                            O022506200021 
        49.      0.172                                            O022506200022 
       60.4     0.1013                                            O022506200023 
       66.6  0.663E-01                                            O022506200024 
        71.    0.6E-01                                            O022506200025 
       77.8   0.56E-01                                            O022506200026 
       88.6   0.23E-01                                            O022506200027 
       97.5  0.138E-01        16.                                 O022506200028 
ENDDATA             15          0                                 O022506200029 
ENDSUBENT           28          0                                 O022506299999 
SUBENT        O0225063   19960918                             0000O022506300001 
BIB                  3          4                                 O022506300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506300006 
ENDBIB               4          0                                 O022506300007 
COMMON               3          3                                 O022506300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506300009 
MEV        ADEG       PER-CENT                                    O022506300010 
      5.542        0.6         3.                                 O022506300011 
ENDCOMMON            3          0                                 O022506300012 
DATA                 3         13                                 O022506300013 
ANG-CM     DATA       ERR-T                                       O022506300014 
ADEG       MB/SR      PER-CENT                                    O022506300015 
        9.6      0.121        21.                                 O022506300016 
        12.      0.161                                            O022506300017 
        16.      0.225                                            O022506300018 
       26.4      0.163                                            O022506300019 
       30.6      0.176                                            O022506300020 
       37.7       0.12                                            O022506300021 
       47.8      0.126                                            O022506300022 
       59.4  0.636E-01                                            O022506300023 
       65.5   0.54E-01                                            O022506300024 
       72.1  0.644E-01                                            O022506300025 
       78.4  0.427E-01                                            O022506300026 
       87.3   0.23E-01                                            O022506300027 
       98.6  0.164E-01        18.                                 O022506300028 
ENDDATA             15          0                                 O022506300029 
ENDSUBENT           28          0                                 O022506399999 
SUBENT        O0225064   19960918                             0000O022506400001 
BIB                  3          4                                 O022506400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506400006 
ENDBIB               4          0                                 O022506400007 
COMMON               3          3                                 O022506400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506400009 
MEV        ADEG       PER-CENT                                    O022506400010 
      5.564        0.6         3.                                 O022506400011 
ENDCOMMON            3          0                                 O022506400012 
DATA                 3         11                                 O022506400013 
ANG-CM     DATA       ERR-T                                       O022506400014 
ADEG       MB/SR      PER-CENT                                    O022506400015 
       10.6      0.147         9.                                 O022506400016 
       14.4      0.269                                            O022506400017 
       27.5      0.158                                            O022506400018 
       29.8   0.72E-01                                            O022506400019 
       38.9   0.29E-01                                            O022506400020 
       60.6  0.155E-01                                            O022506400021 
       67.4  0.155E-01                                            O022506400022 
       73.3  0.173E-01        12.                                 O022506400023 
       80.3   0.13E-01                                            O022506400024 
       89.3   0.59E-02        14.                                 O022506400025 
       99.2   0.91E-02        25.                                 O022506400026 
ENDDATA             13          0                                 O022506400027 
ENDSUBENT           26          0                                 O022506499999 
SUBENT        O0225065   19960918                             0000O022506500001 
BIB                  3          4                                 O022506500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506500006 
ENDBIB               4          0                                 O022506500007 
COMMON               3          3                                 O022506500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506500009 
MEV        ADEG       PER-CENT                                    O022506500010 
      5.596        0.6         3.                                 O022506500011 
ENDCOMMON            3          0                                 O022506500012 
DATA                 3         12                                 O022506500013 
ANG-CM     DATA       ERR-T                                       O022506500014 
ADEG       MB/SR      PER-CENT                                    O022506500015 
        7.3      0.108        14.                                 O022506500016 
       14.2   0.91E-01                                            O022506500017 
       15.8     0.1084                                            O022506500018 
       20.3   0.76E-01                                            O022506500019 
        25.  0.373E-01                                            O022506500020 
       31.7  0.448E-01                                            O022506500021 
       50.9  0.222E-01                                            O022506500022 
       63.9  0.145E-01                                            O022506500023 
       71.9   0.54E-02        28.                                 O022506500024 
       79.5   0.54E-02        11.                                 O022506500025 
       90.2   0.45E-02        13.                                 O022506500026 
       98.3   0.78E-02        40.                                 O022506500027 
ENDDATA             14          0                                 O022506500028 
ENDSUBENT           27          0                                 O022506599999 
SUBENT        O0225066   19960918                             0000O022506600001 
BIB                  3          4                                 O022506600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506600006 
ENDBIB               4          0                                 O022506600007 
COMMON               3          3                                 O022506600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506600009 
MEV        ADEG       PER-CENT                                    O022506600010 
      5.615        0.6         3.                                 O022506600011 
ENDCOMMON            3          0                                 O022506600012 
DATA                 3         12                                 O022506600013 
ANG-CM     DATA       ERR-T                                       O022506600014 
ADEG       MB/SR      PER-CENT                                    O022506600015 
        9.1   0.29E-01        28.                                 O022506600016 
        22.    0.3E-01        13.                                 O022506600017 
       28.9  0.253E-01                                            O022506600018 
       34.7  0.363E-01                                            O022506600019 
       37.5  0.254E-01                                            O022506600020 
       50.3   0.25E-01                                            O022506600021 
       63.3  0.178E-01                                            O022506600022 
       67.9   0.97E-02                                            O022506600023 
       72.6   0.97E-02        19.                                 O022506600024 
       80.7   0.97E-02                                            O022506600025 
       91.2   0.68E-02                                            O022506600026 
      102.1  0.105E-01        14.                                 O022506600027 
ENDDATA             14          0                                 O022506600028 
ENDSUBENT           27          0                                 O022506699999 
SUBENT        O0225067   19960918                             0000O022506700001 
BIB                  3          4                                 O022506700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506700006 
ENDBIB               4          0                                 O022506700007 
COMMON               3          3                                 O022506700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506700009 
MEV        ADEG       PER-CENT                                    O022506700010 
      5.642        0.6         3.                                 O022506700011 
ENDCOMMON            3          0                                 O022506700012 
DATA                 3         13                                 O022506700013 
ANG-CM     DATA       ERR-T                                       O022506700014 
ADEG       MB/SR      PER-CENT                                    O022506700015 
        11.   0.88E-01         9.                                 O022506700016 
       15.3  0.884E-01                                            O022506700017 
       22.2  0.737E-01                                            O022506700018 
       26.8  0.398E-01                                            O022506700019 
       32.7  0.513E-01                                            O022506700020 
        37.  0.477E-01                                            O022506700021 
       48.7  0.338E-01                                            O022506700022 
       63.5    0.8E-02                                            O022506700023 
       67.6 0.1095E-01                                            O022506700024 
        72.   0.83E-02        25.                                 O022506700025 
       80.4   0.12E-01                                            O022506700026 
       89.3  0.659E-02                                            O022506700027 
       98.1   0.38E-02        16.                                 O022506700028 
ENDDATA             15          0                                 O022506700029 
ENDSUBENT           28          0                                 O022506799999 
SUBENT        O0225068   19960918                             0000O022506800001 
BIB                  3          4                                 O022506800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506800006 
ENDBIB               4          0                                 O022506800007 
COMMON               3          3                                 O022506800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506800009 
MEV        ADEG       PER-CENT                                    O022506800010 
      5.658        0.6         3.                                 O022506800011 
ENDCOMMON            3          0                                 O022506800012 
DATA                 3         13                                 O022506800013 
ANG-CM     DATA       ERR-T                                       O022506800014 
ADEG       MB/SR      PER-CENT                                    O022506800015 
       17.1   0.25E-01        40.                                 O022506800016 
       20.5  0.578E-01                                            O022506800017 
       26.9  0.584E-01                                            O022506800018 
       33.2  0.634E-01                                            O022506800019 
        37.      0.102                                            O022506800020 
       43.9   0.93E-01                                            O022506800021 
       55.2   0.38E-01                                            O022506800022 
       71.3  0.213E-01                                            O022506800023 
       75.1  0.211E-01                                            O022506800024 
       79.5  0.194E-01                                            O022506800025 
       86.5  0.114E-01                                            O022506800026 
       97.6   0.81E-02                                            O022506800027 
      108.3  0.826E-02                                            O022506800028 
ENDDATA             15          0                                 O022506800029 
ENDSUBENT           28          0                                 O022506899999 
SUBENT        O0225069   19960918                             0000O022506900001 
BIB                  3          4                                 O022506900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022506900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022506900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022506900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022506900006 
ENDBIB               4          0                                 O022506900007 
COMMON               3          3                                 O022506900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022506900009 
MEV        ADEG       PER-CENT                                    O022506900010 
      5.673        0.4        1.5                                 O022506900011 
ENDCOMMON            3          0                                 O022506900012 
DATA                 3         12                                 O022506900013 
ANG-CM     DATA       ERR-T                                       O022506900014 
ADEG       MB/SR      PER-CENT                                    O022506900015 
       20.4  0.771E-01                                            O022506900016 
       25.7  0.598E-01                                            O022506900017 
       30.8  0.562E-01                                            O022506900018 
       35.9  0.501E-01                                            O022506900019 
       41.7  0.331E-01                                            O022506900020 
       54.6  0.282E-01                                            O022506900021 
       66.4   0.15E-01                                            O022506900022 
       72.3   0.75E-02        12.                                 O022506900023 
       76.6  0.141E-01        13.                                 O022506900024 
       84.6    0.9E-02                                            O022506900025 
       95.5   0.58E-02        10.                                 O022506900026 
      103.6   0.43E-02        14.                                 O022506900027 
ENDDATA             14          0                                 O022506900028 
ENDSUBENT           27          0                                 O022506999999 
SUBENT        O0225070   19960918                             0000O022507000001 
BIB                  3          3                                 O022507000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)               O022507000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507000004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022507000005 
ENDBIB               3          0                                 O022507000006 
COMMON               3          3                                 O022507000007 
E-EXC      ANG-ERR    DATA-ERR                                    O022507000008 
MEV        ADEG       PER-CENT                                    O022507000009 
      5.689        0.4        1.5                                 O022507000010 
ENDCOMMON            3          0                                 O022507000011 
DATA                 2         14                                 O022507000012 
ANG-CM     DATA                                                   O022507000013 
ADEG       MB/SR                                                  O022507000014 
       12.6       0.34                                            O022507000015 
       16.1      0.217                                            O022507000016 
        21.       0.23                                            O022507000017 
       25.8      0.257                                            O022507000018 
       32.1      0.289                                            O022507000019 
        38.       0.31                                            O022507000020 
       41.2     0.2156                                            O022507000021 
       55.1       0.11                                            O022507000022 
       66.5     0.1223                                            O022507000023 
       72.3    0.9E-01                                            O022507000024 
       78.6  0.747E-01                                            O022507000025 
       85.7  0.501E-01                                            O022507000026 
       95.1  0.375E-01                                            O022507000027 
      105.8   0.27E-01                                            O022507000028 
ENDDATA             16          0                                 O022507000029 
ENDSUBENT           28          0                                 O022507099999 
SUBENT        O0225071   19960918                             0000O022507100001 
BIB                  3          4                                 O022507100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)               O022507100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507100006 
ENDBIB               4          0                                 O022507100007 
COMMON               3          3                                 O022507100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507100009 
MEV        ADEG       PER-CENT                                    O022507100010 
      5.720        0.4        2.5                                 O022507100011 
ENDCOMMON            3          0                                 O022507100012 
DATA                 3         13                                 O022507100013 
ANG-CM     DATA       ERR-T                                       O022507100014 
ADEG       MB/SR      PER-CENT                                    O022507100015 
       13.8      0.109        17.                                 O022507100016 
        18.        0.1                                            O022507100017 
       27.7  0.739E-01                                            O022507100018 
       32.6  0.693E-01                                            O022507100019 
       37.4  0.691E-01                                            O022507100020 
       43.2  0.802E-01                                            O022507100021 
       54.9  0.756E-01                                            O022507100022 
       67.6   0.45E-01                                            O022507100023 
       73.5   0.34E-01                                            O022507100024 
       77.8  0.324E-01                                            O022507100025 
       85.1  0.228E-01                                            O022507100026 
       95.4 0.1273E-01                                            O022507100027 
      105.9 0.1009E-01                                            O022507100028 
ENDDATA             15          0                                 O022507100029 
ENDSUBENT           28          0                                 O022507199999 
SUBENT        O0225072   19960918                             0000O022507200001 
BIB                  3          4                                 O022507200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.3   O022507200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507200006 
ENDBIB               4          0                                 O022507200007 
COMMON               3          3                                 O022507200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507200009 
MEV        ADEG       PER-CENT                                    O022507200010 
      5.743        0.6         3.                                 O022507200011 
ENDCOMMON            3          0                                 O022507200012 
DATA                 3         13                                 O022507200013 
ANG-CM     DATA       ERR-T                                       O022507200014 
ADEG       MB/SR      PER-CENT                                    O022507200015 
       13.1   0.29E-01        40.                                 O022507200016 
       19.8    0.3E-01        20.                                 O022507200017 
       24.6    0.2E-01        60.                                 O022507200018 
       28.7  0.116E-01        15.                                 O022507200019 
       34.1   0.23E-01        15.                                 O022507200020 
       38.4   0.21E-01        13.                                 O022507200021 
       51.2   0.15E-01        27.                                 O022507200022 
       63.5   0.21E-01                                            O022507200023 
       67.8  0.176E-01                                            O022507200024 
       74.3  0.114E-01        23.                                 O022507200025 
       80.6  0.103E-01                                            O022507200026 
       93.5  0.666E-02                                            O022507200027 
      100.4   0.47E-02        20.                                 O022507200028 
ENDDATA             15          0                                 O022507200029 
ENDSUBENT           28          0                                 O022507299999 
SUBENT        O0225073   19960918                             0000O022507300001 
BIB                  3          4                                 O022507300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507300006 
ENDBIB               4          0                                 O022507300007 
COMMON               3          3                                 O022507300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507300009 
MEV        ADEG       PER-CENT                                    O022507300010 
      5.763        0.6        2.5                                 O022507300011 
ENDCOMMON            3          0                                 O022507300012 
DATA                 3         11                                 O022507300013 
ANG-CM     DATA       ERR-T                                       O022507300014 
ADEG       MB/SR      PER-CENT                                    O022507300015 
       11.4   0.17E-01        50.                                 O022507300016 
       18.3    0.7E-02        40.                                 O022507300017 
       23.8   0.22E-01        40.                                 O022507300018 
       28.7    0.9E-02        20.                                 O022507300019 
       32.5   0.15E-01        27.                                 O022507300020 
       36.6  0.188E-01                                            O022507300021 
       62.5   0.77E-02        26.                                 O022507300022 
        67.    0.6E-02        25.                                 O022507300023 
       79.7   0.51E-02        14.                                 O022507300024 
       90.4   0.73E-02         8.                                 O022507300025 
      100.9   0.44E-02        20.                                 O022507300026 
ENDDATA             13          0                                 O022507300027 
ENDSUBENT           26          0                                 O022507399999 
SUBENT        O0225074   19960918                             0000O022507400001 
BIB                  3          4                                 O022507400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507400006 
ENDBIB               4          0                                 O022507400007 
COMMON               3          3                                 O022507400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507400009 
MEV        ADEG       PER-CENT                                    O022507400010 
      5.777        0.3        1.5                                 O022507400011 
ENDCOMMON            3          0                                 O022507400012 
DATA                 3         14                                 O022507400013 
ANG-CM     DATA       ERR-T                                       O022507400014 
ADEG       MB/SR      PER-CENT                                    O022507400015 
      13.74   0.47E-01        26.                                 O022507400016 
      18.89  0.641E-01                                            O022507400017 
      23.55   0.28E-01        40.                                 O022507400018 
      29.43  0.278E-01                                            O022507400019 
       33.6    0.2E-01        25.                                 O022507400020 
      38.26  0.183E-01                                            O022507400021 
       41.7  0.342E-01                                            O022507400022 
      51.51    0.3E-01        13.                                 O022507400023 
      63.77  0.183E-01                                            O022507400024 
      68.68   0.95E-02                                            O022507400025 
      73.58   0.98E-02        20.                                 O022507400026 
      80.94   0.62E-02        11.                                 O022507400027 
      90.75   0.38E-02        24.                                 O022507400028 
      100.6   0.79E-02        10.                                 O022507400029 
ENDDATA             16          0                                 O022507400030 
ENDSUBENT           29          0                                 O022507499999 
SUBENT        O0225075   19960918                             0000O022507500001 
BIB                  3          4                                 O022507500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507500006 
ENDBIB               4          0                                 O022507500007 
COMMON               3          3                                 O022507500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507500009 
MEV        ADEG       PER-CENT                                    O022507500010 
      5.796        0.3        1.5                                 O022507500011 
ENDCOMMON            3          0                                 O022507500012 
DATA                 3         10                                 O022507500013 
ANG-CM     DATA       ERR-T                                       O022507500014 
ADEG       MB/SR      PER-CENT                                    O022507500015 
      18.64   0.23E-01        30.                                 O022507500016 
      34.34   0.29E-01        14.                                 O022507500017 
      38.75   0.91E-02        16.                                 O022507500018 
       41.7 0.1726E-01                                            O022507500019 
      51.51    0.1E-01        30.                                 O022507500020 
      65.24   0.83E-02        19.                                 O022507500021 
      68.68   0.59E-02        19.                                 O022507500022 
      73.58  0.102E-01        23.                                 O022507500023 
      80.94   0.55E-02        16.                                 O022507500024 
      92.22   0.12E-02        30.                                 O022507500025 
ENDDATA             12          0                                 O022507500026 
ENDSUBENT           25          0                                 O022507599999 
SUBENT        O0225076   19960918                             0000O022507600001 
BIB                  3          4                                 O022507600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507600006 
ENDBIB               4          0                                 O022507600007 
COMMON               3          3                                 O022507600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507600009 
MEV        ADEG       PER-CENT                                    O022507600010 
      5.813        0.3        1.5                                 O022507600011 
ENDCOMMON            3          0                                 O022507600012 
DATA                 3         15                                 O022507600013 
ANG-CM     DATA       ERR-T                                       O022507600014 
ADEG       MB/SR      PER-CENT                                    O022507600015 
      12.26       0.25                                            O022507600016 
      14.71      0.211                                            O022507600017 
      19.13      0.378                                            O022507600018 
      25.02      0.392                                            O022507600019 
      29.92      0.272                                            O022507600020 
      35.81     0.1351                                            O022507600021 
      40.71  0.445E-01                                            O022507600022 
      43.17    0.7E-01                                            O022507600023 
      52.98     0.1143                                            O022507600024 
      65.24   0.39E-01                                            O022507600025 
      70.15  0.463E-01                                            O022507600026 
      76.03  0.365E-01                                            O022507600027 
       82.9  0.362E-01                                            O022507600028 
      93.69  0.133E-01                                            O022507600029 
       105.   0.73E-02        11.                                 O022507600030 
ENDDATA             17          0                                 O022507600031 
ENDSUBENT           30          0                                 O022507699999 
SUBENT        O0225077   19960918                             0000O022507700001 
BIB                  3          4                                 O022507700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507700006 
ENDBIB               4          0                                 O022507700007 
COMMON               3          3                                 O022507700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507700009 
MEV        ADEG       PER-CENT                                    O022507700010 
      5.842        0.3        1.5                                 O022507700011 
ENDCOMMON            3          0                                 O022507700012 
DATA                 3         14                                 O022507700013 
ANG-CM     DATA       ERR-T                                       O022507700014 
ADEG       MB/SR      PER-CENT                                    O022507700015 
      14.71      0.138        20.                                 O022507700016 
      22.07      0.112                                            O022507700017 
      29.43   0.48E-01        19.                                 O022507700018 
      31.88  0.462E-01                                            O022507700019 
      36.79  0.374E-01                                            O022507700020 
      41.69   0.23E-01                                            O022507700021 
      45.62  0.256E-01                                            O022507700022 
      55.43  0.305E-01                                            O022507700023 
      68.67  0.283E-01                                            O022507700024 
      73.58  0.244E-01                                            O022507700025 
      78.48  0.185E-01        10.                                 O022507700026 
      85.84   0.31E-01                                            O022507700027 
      95.65   0.18E-01                                            O022507700028 
      105.5  0.845E-02                                            O022507700029 
ENDDATA             16          0                                 O022507700030 
ENDSUBENT           29          0                                 O022507799999 
SUBENT        O0225078   19960918                             0000O022507800001 
BIB                  3          4                                 O022507800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507800006 
ENDBIB               4          0                                 O022507800007 
COMMON               3          3                                 O022507800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507800009 
MEV        ADEG       PER-CENT                                    O022507800010 
      5.872        0.3        1.5                                 O022507800011 
ENDCOMMON            3          0                                 O022507800012 
DATA                 3         13                                 O022507800013 
ANG-CM     DATA       ERR-T                                       O022507800014 
ADEG       MB/SR      PER-CENT                                    O022507800015 
      19.62   0.23E-01        40.                                 O022507800016 
      29.43    0.7E-01        20.                                 O022507800017 
      34.33  0.491E-01                                            O022507800018 
      39.24  0.424E-01                                            O022507800019 
      44.14   0.32E-01                                            O022507800020 
       46.6   0.49E-01                                            O022507800021 
      56.41  0.544E-01                                            O022507800022 
      68.67 0.1868E-01                                            O022507800023 
      75.05   0.17E-01                                            O022507800024 
       80.2   0.84E-02        25.                                 O022507800025 
      87.31   0.76E-02                                            O022507800026 
      97.12   0.41E-02        20.                                 O022507800027 
      106.9    0.5E-02        20.                                 O022507800028 
ENDDATA             15          0                                 O022507800029 
ENDSUBENT           28          0                                 O022507899999 
SUBENT        O0225079   19960918                             0000O022507900001 
BIB                  3          4                                 O022507900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022507900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022507900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022507900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022507900006 
ENDBIB               4          0                                 O022507900007 
COMMON               3          3                                 O022507900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022507900009 
MEV        ADEG       PER-CENT                                    O022507900010 
      5.898        0.6         4.                                 O022507900011 
ENDCOMMON            3          0                                 O022507900012 
DATA                 3         12                                 O022507900013 
ANG-CM     DATA       ERR-T                                       O022507900014 
ADEG       MB/SR      PER-CENT                                    O022507900015 
       14.1   0.12E-01        50.                                 O022507900016 
       26.7  0.152E-01         7.                                 O022507900017 
       29.9   0.13E-01        23.                                 O022507900018 
       35.5  0.108E-01        18.                                 O022507900019 
       37.9  0.155E-01         8.                                 O022507900020 
       48.1   0.16E-01        25.                                 O022507900021 
       61.1  0.134E-01        13.                                 O022507900022 
       65.5  0.114E-01                                            O022507900023 
       69.9   0.96E-02        27.                                 O022507900024 
       78.5   0.97E-02                                            O022507900025 
       89.9   0.65E-02        15.                                 O022507900026 
      100.2   0.71E-02         8.                                 O022507900027 
ENDDATA             14          0                                 O022507900028 
ENDSUBENT           27          0                                 O022507999999 
SUBENT        O0225080   19960918                             0000O022508000001 
BIB                  3          4                                 O022508000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022508000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508000006 
ENDBIB               4          0                                 O022508000007 
COMMON               3          3                                 O022508000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508000009 
MEV        ADEG       PER-CENT                                    O022508000010 
      5.923        0.6         3.                                 O022508000011 
ENDCOMMON            3          0                                 O022508000012 
DATA                 3         15                                 O022508000013 
ANG-CM     DATA       ERR-T                                       O022508000014 
ADEG       MB/SR      PER-CENT                                    O022508000015 
       10.7   0.55E-01        50.                                 O022508000016 
       11.8   0.33E-01        30.                                 O022508000017 
       20.2   0.37E-01        19.                                 O022508000018 
       24.7   0.36E-01        14.                                 O022508000019 
       29.5  0.136E-01        20.                                 O022508000020 
        34.   0.14E-01        40.                                 O022508000021 
       40.4  0.132E-01                                            O022508000022 
       42.3   0.26E-01                                            O022508000023 
       52.2   0.26E-01        15.                                 O022508000024 
       65.1  0.255E-01                                            O022508000025 
       69.4  0.157E-01                                            O022508000026 
       75.8  0.139E-01         9.                                 O022508000027 
       82.3  0.156E-01                                            O022508000028 
       93.7   0.91E-02         7.                                 O022508000029 
      104.5   0.68E-02         6.                                 O022508000030 
ENDDATA             17          0                                 O022508000031 
ENDSUBENT           30          0                                 O022508099999 
SUBENT        O0225081   19960918                             0000O022508100001 
BIB                  3          4                                 O022508100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.3    O022508100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508100006 
ENDBIB               4          0                                 O022508100007 
COMMON               3          3                                 O022508100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508100009 
MEV        ADEG       PER-CENT                                    O022508100010 
      5.948        0.6         3.                                 O022508100011 
ENDCOMMON            3          0                                 O022508100012 
DATA                 3         15                                 O022508100013 
ANG-CM     DATA       ERR-T                                       O022508100014 
ADEG       MB/SR      PER-CENT                                    O022508100015 
        7.2   0.72E-01        30.                                 O022508100016 
       11.9    0.4E-01        25.                                 O022508100017 
       14.4   0.44E-01        11.                                 O022508100018 
       20.2   0.56E-01         9.                                 O022508100019 
       28.1  0.131E-01        15.                                 O022508100020 
       32.3   0.16E-01        25.                                 O022508100021 
       34.3    0.1E-01        10.                                 O022508100022 
       37.9  0.262E-01                                            O022508100023 
       50.9  0.199E-01        14.                                 O022508100024 
       59.8  0.131E-01                                            O022508100025 
       67.4    0.5E-02        18.                                 O022508100026 
       71.8   0.42E-02        40.                                 O022508100027 
       79.7   0.55E-02        14.                                 O022508100028 
       89.2    0.3E-02        17.                                 O022508100029 
      101.9   0.35E-02        20.                                 O022508100030 
ENDDATA             17          0                                 O022508100031 
ENDSUBENT           30          0                                 O022508199999 
SUBENT        O0225082   19960918                             0000O022508200001 
BIB                  3          4                                 O022508200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508200006 
ENDBIB               4          0                                 O022508200007 
COMMON               3          3                                 O022508200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508200009 
MEV        ADEG       PER-CENT                                    O022508200010 
      5.966        0.6        2.5                                 O022508200011 
ENDCOMMON            3          0                                 O022508200012 
DATA                 3         11                                 O022508200013 
ANG-CM     DATA       ERR-T                                       O022508200014 
ADEG       MB/SR      PER-CENT                                    O022508200015 
       12.9    0.5E-01        20.                                 O022508200016 
       17.1   0.54E-01        11.                                 O022508200017 
        24.   0.27E-01        22.                                 O022508200018 
       28.3  0.292E-01                                            O022508200019 
       38.6  0.245E-01                                            O022508200020 
       51.4  0.325E-01                                            O022508200021 
       64.3  0.292E-01                                            O022508200022 
       68.6  0.272E-01                                            O022508200023 
       72.9  0.292E-01                                            O022508200024 
       81.4  0.172E-01                                            O022508200025 
       92.6  0.121E-01                                            O022508200026 
ENDDATA             13          0                                 O022508200027 
ENDSUBENT           26          0                                 O022508299999 
SUBENT        O0225083   19960918                             0000O022508300001 
BIB                  3          3                                 O022508300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508300004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022508300005 
ENDBIB               3          0                                 O022508300006 
COMMON               3          3                                 O022508300007 
E-EXC      ANG-ERR    DATA-ERR                                    O022508300008 
MEV        ADEG       PER-CENT                                    O022508300009 
      5.993        0.6        2.5                                 O022508300010 
ENDCOMMON            3          0                                 O022508300011 
DATA                 2         13                                 O022508300012 
ANG-CM     DATA                                                   O022508300013 
ADEG       MB/SR                                                  O022508300014 
        8.6      0.329                                            O022508300015 
       19.7       0.28                                            O022508300016 
        24.      0.208                                            O022508300017 
       28.3      0.197                                            O022508300018 
       34.3      0.275                                            O022508300019 
       38.6      0.208                                            O022508300020 
       42.9      0.296                                            O022508300021 
       51.4      0.208                                            O022508300022 
       64.3   0.86E-01                                            O022508300023 
       68.6  0.721E-01                                            O022508300024 
       72.9  0.721E-01                                            O022508300025 
       81.4   0.72E-01                                            O022508300026 
       92.6    0.4E-01                                            O022508300027 
ENDDATA             15          0                                 O022508300028 
ENDSUBENT           27          0                                 O022508399999 
SUBENT        O0225084   19960918                             0000O022508400001 
BIB                  3          3                                 O022508400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508400004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022508400005 
ENDBIB               3          0                                 O022508400006 
COMMON               3          3                                 O022508400007 
E-EXC      ANG-ERR    DATA-ERR                                    O022508400008 
MEV        ADEG       PER-CENT                                    O022508400009 
      6.010        0.6        2.5                                 O022508400010 
ENDCOMMON            3          0                                 O022508400011 
DATA                 2         14                                 O022508400012 
ANG-CM     DATA                                                   O022508400013 
ADEG       MB/SR                                                  O022508400014 
       10.4      0.199                                            O022508400015 
       15.5       0.12                                            O022508400016 
       19.8       0.24                                            O022508400017 
       24.1      0.189                                            O022508400018 
       30.5      0.145                                            O022508400019 
       35.1      0.122                                            O022508400020 
       36.8  0.518E-01                                            O022508400021 
       41.1  0.735E-01                                            O022508400022 
       52.2  0.744E-01                                            O022508400023 
       62.4  0.419E-01                                            O022508400024 
       69.2  0.502E-01                                            O022508400025 
       75.2  0.505E-01                                            O022508400026 
        82.  0.274E-01                                            O022508400027 
       90.9  0.233E-01                                            O022508400028 
ENDDATA             16          0                                 O022508400029 
ENDSUBENT           28          0                                 O022508499999 
SUBENT        O0225085   19960918                             0000O022508500001 
BIB                  3          4                                 O022508500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508500006 
ENDBIB               4          0                                 O022508500007 
COMMON               3          3                                 O022508500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508500009 
MEV        ADEG       PER-CENT                                    O022508500010 
      6.035        0.6         3.                                 O022508500011 
ENDCOMMON            3          0                                 O022508500012 
DATA                 3         14                                 O022508500013 
ANG-CM     DATA       ERR-T                                       O022508500014 
ADEG       MB/SR      PER-CENT                                    O022508500015 
       11.1      0.107        27.                                 O022508500016 
       12.9   0.37E-01        24.                                 O022508500017 
       19.7  0.493E-01                                            O022508500018 
       24.4   0.44E-01        14.                                 O022508500019 
        30.  0.183E-01        14.                                 O022508500020 
       34.3   0.15E-01        27.                                 O022508500021 
       41.1   0.17E-01                                            O022508500022 
       42.9   0.26E-01                                            O022508500023 
       51.4  0.218E-01         9.                                 O022508500024 
       64.3   0.63E-02        27.                                 O022508500025 
       68.6    0.9E-02        10.                                 O022508500026 
       72.9    0.1E-01        15.                                 O022508500027 
       81.4 0.1074E-01                                            O022508500028 
       92.6   0.41E-02        17.                                 O022508500029 
ENDDATA             16          0                                 O022508500030 
ENDSUBENT           29          0                                 O022508599999 
SUBENT        O0225086   19960918                             0000O022508600001 
BIB                  3          4                                 O022508600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508600006 
ENDBIB               4          0                                 O022508600007 
COMMON               3          3                                 O022508600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508600009 
MEV        ADEG       PER-CENT                                    O022508600010 
      6.052        0.5        2.5                                 O022508600011 
ENDCOMMON            3          0                                 O022508600012 
DATA                 3         13                                 O022508600013 
ANG-CM     DATA       ERR-T                                       O022508600014 
ADEG       MB/SR      PER-CENT                                    O022508600015 
       13.4   0.44E-01        25.                                 O022508600016 
       20.3  0.753E-01                                            O022508600017 
        25.   0.63E-01        11.                                 O022508600018 
       30.6  0.628E-01                                            O022508600019 
       34.9  0.628E-01                                            O022508600020 
       41.7   0.34E-01        21.                                 O022508600021 
       43.4   0.34E-01                                            O022508600022 
        52.   0.12E-01        25.                                 O022508600023 
       64.8   0.12E-01                                            O022508600024 
       69.1  0.123E-01                                            O022508600025 
       75.5   0.42E-02        40.                                 O022508600026 
       81.9    0.5E-02                                            O022508600027 
       94.8   0.67E-02                                            O022508600028 
ENDDATA             15          0                                 O022508600029 
ENDSUBENT           28          0                                 O022508699999 
SUBENT        O0225087   19960918                             0000O022508700001 
BIB                  3          4                                 O022508700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508700006 
ENDBIB               4          0                                 O022508700007 
COMMON               3          3                                 O022508700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508700009 
MEV        ADEG       PER-CENT                                    O022508700010 
      6.082        0.6        2.5                                 O022508700011 
ENDCOMMON            3          0                                 O022508700012 
DATA                 3         13                                 O022508700013 
ANG-CM     DATA       ERR-T                                       O022508700014 
ADEG       MB/SR      PER-CENT                                    O022508700015 
       14.6   0.58E-01        17.                                 O022508700016 
       20.2  0.988E-01                                            O022508700017 
       24.4   0.49E-01        16.                                 O022508700018 
       28.7  0.342E-01                                            O022508700019 
       34.7  0.486E-01                                            O022508700020 
        39.  0.224E-01                                            O022508700021 
       43.7   0.24E-01                                            O022508700022 
        54.    0.2E-01        15.                                 O022508700023 
       63.8  0.219E-01                                            O022508700024 
       69.8    0.2E-01                                            O022508700025 
       75.4   0.11E-01        26.                                 O022508700026 
       82.6   0.82E-02                                            O022508700027 
       92.9  0.931E-02                                            O022508700028 
ENDDATA             15          0                                 O022508700029 
ENDSUBENT           28          0                                 O022508799999 
SUBENT        O0225088   19960918                             0000O022508800001 
BIB                  3          4                                 O022508800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022508800006 
ENDBIB               4          0                                 O022508800007 
COMMON               3          3                                 O022508800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022508800009 
MEV        ADEG       PER-CENT                                    O022508800010 
      6.099        0.6         3.                                 O022508800011 
ENDCOMMON            3          0                                 O022508800012 
DATA                 3         14                                 O022508800013 
ANG-CM     DATA       ERR-T                                       O022508800014 
ADEG       MB/SR      PER-CENT                                    O022508800015 
       10.1   0.83E-01        24.                                 O022508800016 
       15.3   0.41E-01        70.                                 O022508800017 
        20.  0.696E-01                                            O022508800018 
        26.   0.58E-01        17.                                 O022508800019 
        29.  0.535E-01                                            O022508800020 
       34.5   0.51E-01        14.                                 O022508800021 
       38.8   0.41E-01                                            O022508800022 
       43.1   0.49E-01                                            O022508800023 
       53.8  0.489E-01                                            O022508800024 
       64.5  0.344E-01                                            O022508800025 
       68.8  0.326E-01                                            O022508800026 
       74.4  0.382E-01                                            O022508800027 
       81.7  0.315E-01                                            O022508800028 
       92.8  0.192E-01                                            O022508800029 
ENDDATA             16          0                                 O022508800030 
ENDSUBENT           29          0                                 O022508899999 
SUBENT        O0225089   19960918                             0000O022508900001 
BIB                  3          3                                 O022508900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022508900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022508900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022508900005 
ENDBIB               3          0                                 O022508900006 
COMMON               2          3                                 O022508900007 
E-EXC      ANG-ERR                                                O022508900008 
MEV        ADEG                                                   O022508900009 
      6.170        0.6                                            O022508900010 
ENDCOMMON            3          0                                 O022508900011 
DATA                 3          9                                 O022508900012 
ANG-CM     DATA       ERR-T                                       O022508900013 
ADEG       MB/SR      PER-CENT                                    O022508900014 
       11.3   0.65E-01        30.                                 O022508900015 
       15.6   0.54E-01         9.                                 O022508900016 
       17.3   0.16E-01        40.                                 O022508900017 
       23.7   0.16E-01        30.                                 O022508900018 
       33.1    0.1E-01        70.                                 O022508900019 
       51.5   0.68E-02        40.                                 O022508900020 
       64.4   0.27E-02        60.                                 O022508900021 
       80.2   0.14E-02        70.                                 O022508900022 
       90.1   0.17E-02        40.                                 O022508900023 
ENDDATA             11          0                                 O022508900024 
ENDSUBENT           23          0                                 O022508999999 
SUBENT        O0225090   19960918                             0000O022509000001 
BIB                  3          4                                 O022509000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509000006 
ENDBIB               4          0                                 O022509000007 
COMMON               3          3                                 O022509000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509000009 
MEV        ADEG       PER-CENT                                    O022509000010 
      6.191        0.6        2.5                                 O022509000011 
ENDCOMMON            3          0                                 O022509000012 
DATA                 3         14                                 O022509000013 
ANG-CM     DATA       ERR-T                                       O022509000014 
ADEG       MB/SR      PER-CENT                                    O022509000015 
       12.9      0.113                                            O022509000016 
       17.1      0.158                                            O022509000017 
       21.4       0.11                                            O022509000018 
       25.7  0.843E-01                                            O022509000019 
        33.   0.71E-01        18.                                 O022509000020 
       37.3  0.295E-01                                            O022509000021 
       38.6   0.42E-01                                            O022509000022 
       51.4  0.354E-01                                            O022509000023 
        63.  0.396E-01                                            O022509000024 
       67.3  0.116E-01                                            O022509000025 
       72.9   0.15E-01        18.                                 O022509000026 
       81.4  0.166E-01                                            O022509000027 
        90.   0.84E-02                                            O022509000028 
      102.9    0.7E-02                                            O022509000029 
ENDDATA             16          0                                 O022509000030 
ENDSUBENT           29          0                                 O022509099999 
SUBENT        O0225091   19960918                             0000O022509100001 
BIB                  3          3                                 O022509100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509100005 
ENDBIB               3          0                                 O022509100006 
COMMON               2          3                                 O022509100007 
E-EXC      ANG-ERR                                                O022509100008 
MEV        ADEG                                                   O022509100009 
      6.214        0.6                                            O022509100010 
ENDCOMMON            3          0                                 O022509100011 
DATA                 3         10                                 O022509100012 
ANG-CM     DATA       ERR-T                                       O022509100013 
ADEG       MB/SR      PER-CENT                                    O022509100014 
       16.2   0.21E-01        30.                                 O022509100015 
        23.  0.158E-01        18.                                 O022509100016 
       27.3   0.14E-01        15.                                 O022509100017 
       31.6   0.18E-01        30.                                 O022509100018 
       37.7  0.116E-01        12.                                 O022509100019 
       40.3  0.138E-01         9.                                 O022509100020 
       50.6   0.21E-01        19.                                 O022509100021 
       66.1   0.58E-02        16.                                 O022509100022 
       80.7   0.37E-02        11.                                 O022509100023 
       89.3   0.44E-02        18.                                 O022509100024 
ENDDATA             12          0                                 O022509100025 
ENDSUBENT           24          0                                 O022509199999 
SUBENT        O0225092   19960918                             0000O022509200001 
BIB                  3          4                                 O022509200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509200006 
ENDBIB               4          0                                 O022509200007 
COMMON               3          3                                 O022509200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509200009 
MEV        ADEG       PER-CENT                                    O022509200010 
      6.233        0.3        1.4                                 O022509200011 
ENDCOMMON            3          0                                 O022509200012 
DATA                 3         13                                 O022509200013 
ANG-CM     DATA       ERR-T                                       O022509200014 
ADEG       MB/SR      PER-CENT                                    O022509200015 
        8.8      0.142        13.                                 O022509200016 
      16.91      0.109         5.                                 O022509200017 
       21.9   0.72E-01        15.                                 O022509200018 
      28.48     0.1127                                            O022509200019 
      30.96   0.93E-01         4.                                 O022509200020 
      37.53  0.488E-01                                            O022509200021 
      39.72  0.567E-01         5.                                 O022509200022 
      63.09  0.453E-01                                            O022509200023 
      68.37  0.212E-01         8.                                 O022509200024 
       72.7   0.59E-02        30.                                 O022509200025 
      80.54  0.107E-01         7.                                 O022509200026 
      90.22   0.87E-02         8.                                 O022509200027 
      100.9   0.38E-02        16.                                 O022509200028 
ENDDATA             15          0                                 O022509200029 
ENDSUBENT           28          0                                 O022509299999 
SUBENT        O0225093   19960918                             0000O022509300001 
BIB                  3          4                                 O022509300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509300006 
ENDBIB               4          0                                 O022509300007 
COMMON               3          3                                 O022509300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509300009 
MEV        ADEG       PER-CENT                                    O022509300010 
      6.248        0.6        2.5                                 O022509300011 
ENDCOMMON            3          0                                 O022509300012 
DATA                 3          8                                 O022509300013 
ANG-CM     DATA       ERR-T                                       O022509300014 
ADEG       MB/SR      PER-CENT                                    O022509300015 
       23.3   0.45E-01        18.                                 O022509300016 
       27.6   0.53E-01                                            O022509300017 
        38.  0.446E-01                                            O022509300018 
       63.8  0.504E-01                                            O022509300019 
       70.2  0.532E-01                                            O022509300020 
       72.4   0.22E-01                                            O022509300021 
        81.  0.205E-01                                            O022509300022 
       92.2  0.172E-01                                            O022509300023 
ENDDATA             10          0                                 O022509300024 
ENDSUBENT           23          0                                 O022509399999 
SUBENT        O0225094   19960918                             0000O022509400001 
BIB                  3          4                                 O022509400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509400006 
ENDBIB               4          0                                 O022509400007 
COMMON               3          3                                 O022509400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509400009 
MEV        ADEG       PER-CENT                                    O022509400010 
      6.261        0.6        2.5                                 O022509400011 
ENDCOMMON            3          0                                 O022509400012 
DATA                 3         13                                 O022509400013 
ANG-CM     DATA       ERR-T                                       O022509400014 
ADEG       MB/SR      PER-CENT                                    O022509400015 
       11.1      0.533                                            O022509400016 
       15.4       0.31                                            O022509400017 
       19.3      0.284                                            O022509400018 
        24.   0.48E-01        15.                                 O022509400019 
        30.   0.58E-01                                            O022509400020 
       34.3    0.9E-01                                            O022509400021 
       38.6  0.461E-01                                            O022509400022 
       42.9    0.5E-01                                            O022509400023 
       64.3    0.1E-01                                            O022509400024 
       75.4  0.286E-01                                            O022509400025 
        84.  0.183E-01                                            O022509400026 
       92.6  0.147E-01                                            O022509400027 
      102.9  0.157E-01                                            O022509400028 
ENDDATA             15          0                                 O022509400029 
ENDSUBENT           28          0                                 O022509499999 
SUBENT        O0225095   19960918                             0000O022509500001 
BIB                  3          4                                 O022509500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509500006 
ENDBIB               4          0                                 O022509500007 
COMMON               3          3                                 O022509500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509500009 
MEV        ADEG       PER-CENT                                    O022509500010 
      6.276        0.6         3.                                 O022509500011 
ENDCOMMON            3          0                                 O022509500012 
DATA                 3         12                                 O022509500013 
ANG-CM     DATA       ERR-T                                       O022509500014 
ADEG       MB/SR      PER-CENT                                    O022509500015 
       11.1      0.108        28.                                 O022509500016 
       17.1    0.8E-01                                            O022509500017 
        24.   0.61E-01        16.                                 O022509500018 
       28.3      0.132                                            O022509500019 
       34.3  0.876E-01                                            O022509500020 
       38.6    0.5E-01                                            O022509500021 
       48.6   0.77E-01                                            O022509500022 
       64.3  0.278E-01                                            O022509500023 
       66.9  0.227E-01                                            O022509500024 
       72.9  0.227E-01                                            O022509500025 
       81.4  0.185E-01                                            O022509500026 
      102.9   0.66E-02                                            O022509500027 
ENDDATA             14          0                                 O022509500028 
ENDSUBENT           27          0                                 O022509599999 
SUBENT        O0225096   19960918                             0000O022509600001 
BIB                  3          4                                 O022509600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509600006 
ENDBIB               4          0                                 O022509600007 
COMMON               3          3                                 O022509600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509600009 
MEV        ADEG       PER-CENT                                    O022509600010 
      6.314        0.6        2.5                                 O022509600011 
ENDCOMMON            3          0                                 O022509600012 
DATA                 3         13                                 O022509600013 
ANG-CM     DATA       ERR-T                                       O022509600014 
ADEG       MB/SR      PER-CENT                                    O022509600015 
        6.6    0.5E-01        18.                                 O022509600016 
       10.8   0.55E-01                                            O022509600017 
       17.2   0.59E-01                                            O022509600018 
       19.7  0.387E-01                                            O022509600019 
       26.4  0.462E-01                                            O022509600020 
       31.4   0.17E-01                                            O022509600021 
        33.  0.205E-01                                            O022509600022 
       57.1  0.292E-01                                            O022509600023 
       61.4   0.16E-01                                            O022509600024 
       67.5   0.14E-01        29.                                 O022509600025 
       76.4    0.8E-02                                            O022509600026 
       85.5   0.47E-02        17.                                 O022509600027 
       98.6   0.29E-02        14.                                 O022509600028 
ENDDATA             15          0                                 O022509600029 
ENDSUBENT           28          0                                 O022509699999 
SUBENT        O0225097   19960918                             0000O022509700001 
BIB                  3          4                                 O022509700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509700006 
ENDBIB               4          0                                 O022509700007 
COMMON               3          3                                 O022509700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509700009 
MEV        ADEG       PER-CENT                                    O022509700010 
      6.332        0.6        2.5                                 O022509700011 
ENDCOMMON            3          0                                 O022509700012 
DATA                 3         12                                 O022509700013 
ANG-CM     DATA       ERR-T                                       O022509700014 
ADEG       MB/SR      PER-CENT                                    O022509700015 
       10.4   0.27E-01        26.                                 O022509700016 
       19.2   0.22E-01        22.                                 O022509700017 
       22.8  0.507E-01                                            O022509700018 
       29.2   0.91E-01                                            O022509700019 
       35.3  0.846E-01                                            O022509700020 
       35.5   0.64E-01                                            O022509700021 
        60.   0.33E-01                                            O022509700022 
       64.3  0.326E-01                                            O022509700023 
       70.1  0.386E-01                                            O022509700024 
       79.1   0.23E-01                                            O022509700025 
       86.2  0.165E-01                                            O022509700026 
      100.9   0.14E-01                                            O022509700027 
ENDDATA             14          0                                 O022509700028 
ENDSUBENT           27          0                                 O022509799999 
SUBENT        O0225098   19960918                             0000O022509800001 
BIB                  3          3                                 O022509800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509800004 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022509800005 
ENDBIB               3          0                                 O022509800006 
COMMON               3          3                                 O022509800007 
E-EXC      ANG-ERR    DATA-ERR                                    O022509800008 
MEV        ADEG       PER-CENT                                    O022509800009 
      6.353        0.6        2.5                                 O022509800010 
ENDCOMMON            3          0                                 O022509800011 
DATA                 2         11                                 O022509800012 
ANG-CM     DATA                                                   O022509800013 
ADEG       MB/SR                                                  O022509800014 
       12.6      0.174                                            O022509800015 
       18.5      0.208                                            O022509800016 
       26.9     0.1026                                            O022509800017 
       31.1      0.146                                            O022509800018 
       38.2    0.7E-01                                            O022509800019 
        42.  0.563E-01                                            O022509800020 
        63.  0.356E-01                                            O022509800021 
       67.6  0.137E-01                                            O022509800022 
       73.1   0.21E-01                                            O022509800023 
       81.5   0.96E-02                                            O022509800024 
       89.9   0.96E-02                                            O022509800025 
ENDDATA             13          0                                 O022509800026 
ENDSUBENT           25          0                                 O022509899999 
SUBENT        O0225099   19960918                             0000O022509900001 
BIB                  3          4                                 O022509900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022509900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022509900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022509900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022509900006 
ENDBIB               4          0                                 O022509900007 
COMMON               3          3                                 O022509900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022509900009 
MEV        ADEG       PER-CENT                                    O022509900010 
      6.381        0.6         4.                                 O022509900011 
ENDCOMMON            3          0                                 O022509900012 
DATA                 3         10                                 O022509900013 
ANG-CM     DATA       ERR-T                                       O022509900014 
ADEG       MB/SR      PER-CENT                                    O022509900015 
       18.5   0.17E-01        40.                                 O022509900016 
       26.9  0.113E-01        11.                                 O022509900017 
       39.5  0.144E-01         8.                                 O022509900018 
       52.1    0.5E-01                                            O022509900019 
        63.  0.348E-01                                            O022509900020 
       68.9    0.1E-01                                            O022509900021 
       73.1   0.21E-01         9.                                 O022509900022 
       81.5  0.144E-01                                            O022509900023 
       92.4  0.101E-01                                            O022509900024 
       98.3    0.6E-02        10.                                 O022509900025 
ENDDATA             12          0                                 O022509900026 
ENDSUBENT           25          0                                 O022509999999 
SUBENT        O0225100   19960918                             0000O022510000001 
BIB                  3          4                                 O022510000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510000006 
ENDBIB               4          0                                 O022510000007 
COMMON               3          3                                 O022510000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510000009 
MEV        ADEG       PER-CENT                                    O022510000010 
      6.393        0.6        2.5                                 O022510000011 
ENDCOMMON            3          0                                 O022510000012 
DATA                 3         14                                 O022510000013 
ANG-CM     DATA       ERR-T                                       O022510000014 
ADEG       MB/SR      PER-CENT                                    O022510000015 
       10.1   0.58E-01        40.                                 O022510000016 
       14.3   0.38E-01        21.                                 O022510000017 
       18.5   0.41E-01        17.                                 O022510000018 
       22.7   0.63E-01                                            O022510000019 
       29.4  0.446E-01                                            O022510000020 
       32.3  0.569E-01                                            O022510000021 
       38.2  0.279E-01                                            O022510000022 
       39.5  0.441E-01                                            O022510000023 
        63.  0.271E-01                                            O022510000024 
       68.9  0.251E-01                                            O022510000025 
       75.6  0.157E-01         8.                                 O022510000026 
       81.5   0.11E-01                                            O022510000027 
       89.9   0.71E-02                                            O022510000028 
      100.8   0.35E-02        23.                                 O022510000029 
ENDDATA             16          0                                 O022510000030 
ENDSUBENT           29          0                                 O022510099999 
SUBENT        O0225101   19960918                             0000O022510100001 
BIB                  3          4                                 O022510100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510100006 
ENDBIB               4          0                                 O022510100007 
COMMON               3          3                                 O022510100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510100009 
MEV        ADEG       PER-CENT                                    O022510100010 
      6.423        0.6        2.5                                 O022510100011 
ENDCOMMON            3          0                                 O022510100012 
DATA                 3         14                                 O022510100013 
ANG-CM     DATA       ERR-T                                       O022510100014 
ADEG       MB/SR      PER-CENT                                    O022510100015 
       10.1   0.85E-01        27.                                 O022510100016 
       14.3      0.112                                            O022510100017 
       18.5      0.149                                            O022510100018 
       29.4      0.149                                            O022510100019 
       35.3       0.13                                            O022510100020 
       39.5  0.455E-01                                            O022510100021 
        42.  0.455E-01                                            O022510100022 
       52.1  0.507E-01                                            O022510100023 
       63.4    0.9E-02         9.                                 O022510100024 
       68.9   0.75E-02        19.                                 O022510100025 
       73.1   0.58E-02        30.                                 O022510100026 
       81.5   0.75E-02                                            O022510100027 
       89.9    0.7E-02        16.                                 O022510100028 
      102.5   0.63E-02        10.                                 O022510100029 
ENDDATA             16          0                                 O022510100030 
ENDSUBENT           29          0                                 O022510199999 
SUBENT        O0225102   19960918                             0000O022510200001 
BIB                  3          4                                 O022510200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510200006 
ENDBIB               4          0                                 O022510200007 
COMMON               3          3                                 O022510200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510200009 
MEV        ADEG       PER-CENT                                    O022510200010 
      6.443        0.6         5.                                 O022510200011 
ENDCOMMON            3          0                                 O022510200012 
DATA                 3         12                                 O022510200013 
ANG-CM     DATA       ERR-T                                       O022510200014 
ADEG       MB/SR      PER-CENT                                    O022510200015 
       12.6    0.7E-01        40.                                 O022510200016 
       18.5  0.586E-01                                            O022510200017 
       29.4  0.489E-01                                            O022510200018 
       39.5   0.63E-01                                            O022510200019 
       45.5    0.8E-01                                            O022510200020 
       52.1  0.439E-01                                            O022510200021 
       64.7  0.347E-01                                            O022510200022 
       68.9  0.255E-01                                            O022510200023 
       75.6   0.15E-01        15.                                 O022510200024 
       81.5  0.213E-01                                            O022510200025 
       89.9  0.103E-01                                            O022510200026 
      101.2 0.1031E-01                                            O022510200027 
ENDDATA             14          0                                 O022510200028 
ENDSUBENT           27          0                                 O022510299999 
SUBENT        O0225103   19960918                             0000O022510300001 
BIB                  3          4                                 O022510300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510300006 
ENDBIB               4          0                                 O022510300007 
COMMON               3          3                                 O022510300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510300009 
MEV        ADEG       PER-CENT                                    O022510300010 
      6.458        0.6        2.5                                 O022510300011 
ENDCOMMON            3          0                                 O022510300012 
DATA                 3         12                                 O022510300013 
ANG-CM     DATA       ERR-T                                       O022510300014 
ADEG       MB/SR      PER-CENT                                    O022510300015 
       12.2   0.71E-01        40.                                 O022510300016 
        13.   0.35E-01        29.                                 O022510300017 
       18.5   0.59E-01                                            O022510300018 
       26.9  0.145E-01        13.                                 O022510300019 
       39.5   0.35E-01                                            O022510300020 
       50.4  0.354E-01                                            O022510300021 
       64.7   0.28E-01                                            O022510300022 
       68.9    0.2E-01                                            O022510300023 
       73.1  0.195E-01        12.                                 O022510300024 
       79.8  0.176E-01                                            O022510300025 
       89.9   0.14E-01                                            O022510300026 
      100.8  0.138E-01                                            O022510300027 
ENDDATA             14          0                                 O022510300028 
ENDSUBENT           27          0                                 O022510399999 
SUBENT        O0225104   19960918                             0000O022510400001 
BIB                  3          4                                 O022510400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510400006 
ENDBIB               4          0                                 O022510400007 
COMMON               3          3                                 O022510400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510400009 
MEV        ADEG       PER-CENT                                    O022510400010 
      6.483        0.6        2.5                                 O022510400011 
ENDCOMMON            3          0                                 O022510400012 
DATA                 3         15                                 O022510400013 
ANG-CM     DATA       ERR-T                                       O022510400014 
ADEG       MB/SR      PER-CENT                                    O022510400015 
       10.1      0.132        18.                                 O022510400016 
       14.3   0.83E-01        14.                                 O022510400017 
       18.5      0.187                                            O022510400018 
       22.7      0.169                                            O022510400019 
       26.9      0.157                                            O022510400020 
       31.1       0.12                                            O022510400021 
       37.8  0.699E-01                                            O022510400022 
        42.  0.834E-01                                            O022510400023 
       52.1   0.59E-01                                            O022510400024 
       60.5  0.346E-01                                            O022510400025 
       67.6  0.346E-01                                            O022510400026 
       73.1   0.14E-01        19.                                 O022510400027 
       80.2  0.204E-01                                            O022510400028 
       89.9  0.144E-01                                            O022510400029 
       98.3  0.134E-01                                            O022510400030 
ENDDATA             17          0                                 O022510400031 
ENDSUBENT           30          0                                 O022510499999 
SUBENT        O0225105   19960918                             0000O022510500001 
BIB                  3          4                                 O022510500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510500006 
ENDBIB               4          0                                 O022510500007 
COMMON               3          3                                 O022510500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510500009 
MEV        ADEG       PER-CENT                                    O022510500010 
      6.529        0.6        2.5                                 O022510500011 
ENDCOMMON            3          0                                 O022510500012 
DATA                 3         14                                 O022510500013 
ANG-CM     DATA       ERR-T                                       O022510500014 
ADEG       MB/SR      PER-CENT                                    O022510500015 
        8.8   0.49E-01        40.                                 O022510500016 
       12.6   0.41E-01        24.                                 O022510500017 
       16.8  0.694E-01                                            O022510500018 
       21.4  0.771E-01                                            O022510500019 
       26.9  0.694E-01                                            O022510500020 
       31.1      0.118                                            O022510500021 
       39.5  0.936E-01                                            O022510500022 
       50.4   0.65E-01                                            O022510500023 
       60.5  0.288E-01                                            O022510500024 
       67.2  0.343E-01                                            O022510500025 
       71.8  0.455E-01                                            O022510500026 
       80.2  0.268E-01                                            O022510500027 
       89.9  0.229E-01                                            O022510500028 
      100.8    0.8E-02                                            O022510500029 
ENDDATA             16          0                                 O022510500030 
ENDSUBENT           29          0                                 O022510599999 
SUBENT        O0225106   19960918                             0000O022510600001 
BIB                  3          4                                 O022510600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510600006 
ENDBIB               4          0                                 O022510600007 
COMMON               3          3                                 O022510600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510600009 
MEV        ADEG       PER-CENT                                    O022510600010 
      6.544        0.6        2.5                                 O022510600011 
ENDCOMMON            3          0                                 O022510600012 
DATA                 3         13                                 O022510600013 
ANG-CM     DATA       ERR-T                                       O022510600014 
ADEG       MB/SR      PER-CENT                                    O022510600015 
       10.2      0.137        18.                                 O022510600016 
       14.5  0.875E-01                                            O022510600017 
       18.8      0.182                                            O022510600018 
       23.1      0.106                                            O022510600019 
       34.2      0.164                                            O022510600020 
       40.2    0.8E-01                                            O022510600021 
       46.2  0.559E-01                                            O022510600022 
       53.1    0.8E-01                                            O022510600023 
       65.9   0.44E-01                                            O022510600024 
       70.2  0.327E-01                                            O022510600025 
       74.5   0.18E-01        17.                                 O022510600026 
        83.  0.229E-01                                            O022510600027 
      102.7   0.16E-01                                            O022510600028 
ENDDATA             15          0                                 O022510600029 
ENDSUBENT           28          0                                 O022510699999 
SUBENT        O0225107   19960918                             0000O022510700001 
BIB                  3          4                                 O022510700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510700006 
ENDBIB               4          0                                 O022510700007 
COMMON               3          3                                 O022510700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510700009 
MEV        ADEG       PER-CENT                                    O022510700010 
      6.572        0.6         3.                                 O022510700011 
ENDCOMMON            3          0                                 O022510700012 
DATA                 3         12                                 O022510700013 
ANG-CM     DATA       ERR-T                                       O022510700014 
ADEG       MB/SR      PER-CENT                                    O022510700015 
       14.5    0.2E-01        50.                                 O022510700016 
       17.1   0.28E-01        14.                                 O022510700017 
       23.1   0.16E-01        25.                                 O022510700018 
       34.2   0.22E-01        23.                                 O022510700019 
       38.1  0.135E-01                                            O022510700020 
       42.8  0.169E-01                                            O022510700021 
       51.8   0.17E-01        24.                                 O022510700022 
       64.6   0.42E-02        40.                                 O022510700023 
       74.5    0.6E-02        23.                                 O022510700024 
       81.3    0.5E-02        18.                                 O022510700025 
       91.6   0.42E-02        21.                                 O022510700026 
      100.2   0.11E-02        40.                                 O022510700027 
ENDDATA             14          0                                 O022510700028 
ENDSUBENT           27          0                                 O022510799999 
SUBENT        O0225108   19960918                             0000O022510800001 
BIB                  3          4                                 O022510800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510800006 
ENDBIB               4          0                                 O022510800007 
COMMON               3          3                                 O022510800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510800009 
MEV        ADEG       PER-CENT                                    O022510800010 
      6.588        0.6        2.5                                 O022510800011 
ENDCOMMON            3          0                                 O022510800012 
DATA                 3         12                                 O022510800013 
ANG-CM     DATA       ERR-T                                       O022510800014 
ADEG       MB/SR      PER-CENT                                    O022510800015 
       10.2   0.59E-01        40.                                 O022510800016 
       18.8   0.32E-01        19.                                 O022510800017 
       33.8  0.657E-01                                            O022510800018 
       38.5  0.325E-01                                            O022510800019 
       42.4   0.35E-01                                            O022510800020 
       53.1  0.272E-01         9.                                 O022510800021 
       65.9  0.144E-01         9.                                 O022510800022 
       70.2  0.205E-01                                            O022510800023 
       74.5  0.228E-01                                            O022510800024 
        83.   0.79E-02                                            O022510800025 
       91.6   0.42E-02        19.                                 O022510800026 
      102.7   0.29E-02        28.                                 O022510800027 
ENDDATA             14          0                                 O022510800028 
ENDSUBENT           27          0                                 O022510899999 
SUBENT        O0225109   19960918                             0000O022510900001 
BIB                  3          4                                 O022510900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022510900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022510900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022510900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022510900006 
ENDBIB               4          0                                 O022510900007 
COMMON               3          3                                 O022510900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022510900009 
MEV        ADEG       PER-CENT                                    O022510900010 
      6.615        0.6        2.5                                 O022510900011 
ENDCOMMON            3          0                                 O022510900012 
DATA                 3         15                                 O022510900013 
ANG-CM     DATA       ERR-T                                       O022510900014 
ADEG       MB/SR      PER-CENT                                    O022510900015 
       10.3   0.61E-01        30.                                 O022510900016 
       14.5   0.88E-01         9.                                 O022510900017 
       18.8      0.158                                            O022510900018 
       23.1      0.148                                            O022510900019 
       29.9      0.112                                            O022510900020 
       34.2      0.175                                            O022510900021 
       38.5   0.88E-01                                            O022510900022 
       40.2      0.112                                            O022510900023 
       53.1  0.473E-01                                            O022510900024 
       65.9  0.282E-01                                            O022510900025 
       70.2  0.237E-01                                            O022510900026 
       74.5  0.237E-01        11.                                 O022510900027 
        83.  0.237E-01                                            O022510900028 
       91.6  0.199E-01                                            O022510900029 
      102.7   0.25E-02        28.                                 O022510900030 
ENDDATA             17          0                                 O022510900031 
ENDSUBENT           30          0                                 O022510999999 
SUBENT        O0225110   19960918                             0000O022511000001 
BIB                  3          4                                 O022511000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511000006 
ENDBIB               4          0                                 O022511000007 
COMMON               3          3                                 O022511000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511000009 
MEV        ADEG       PER-CENT                                    O022511000010 
      6.631        0.6        2.5                                 O022511000011 
ENDCOMMON            3          0                                 O022511000012 
DATA                 3         10                                 O022511000013 
ANG-CM     DATA       ERR-T                                       O022511000014 
ADEG       MB/SR      PER-CENT                                    O022511000015 
       10.3    0.2E-01        50.                                 O022511000016 
       17.5   0.34E-01        12.                                 O022511000017 
       33.8  0.307E-01                                            O022511000018 
       53.1   0.18E-01        28.                                 O022511000019 
       65.9  0.178E-01                                            O022511000020 
       70.2  0.149E-01                                            O022511000021 
       74.5  0.214E-01                                            O022511000022 
       81.8  0.124E-01                                            O022511000023 
       91.6   0.96E-02                                            O022511000024 
      102.7   0.96E-02                                            O022511000025 
ENDDATA             12          0                                 O022511000026 
ENDSUBENT           25          0                                 O022511099999 
SUBENT        O0225111   19960918                             0000O022511100001 
BIB                  3          4                                 O022511100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511100006 
ENDBIB               4          0                                 O022511100007 
COMMON               3          3                                 O022511100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511100009 
MEV        ADEG       PER-CENT                                    O022511100010 
      6.658        0.6         3.                                 O022511100011 
ENDCOMMON            3          0                                 O022511100012 
DATA                 3         13                                 O022511100013 
ANG-CM     DATA       ERR-T                                       O022511100014 
ADEG       MB/SR      PER-CENT                                    O022511100015 
       10.3      0.134        12.                                 O022511100016 
       12.8   0.83E-01        18.                                 O022511100017 
       17.1  0.991E-01                                            O022511100018 
       23.1   0.83E-01                                            O022511100019 
       29.5  0.924E-01                                            O022511100020 
       38.1    0.7E-01                                            O022511100021 
       40.2   0.83E-01                                            O022511100022 
       53.1   0.41E-01                                            O022511100023 
       64.2   0.41E-01                                            O022511100024 
       68.9   0.32E-01                                            O022511100025 
       74.5  0.242E-01        11.                                 O022511100026 
       81.3  0.225E-01                                            O022511100027 
       91.6  0.142E-01                                            O022511100028 
ENDDATA             15          0                                 O022511100029 
ENDSUBENT           28          0                                 O022511199999 
SUBENT        O0225112   19960918                             0000O022511200001 
BIB                  3          4                                 O022511200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511200006 
ENDBIB               4          0                                 O022511200007 
COMMON               3          3                                 O022511200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511200009 
MEV        ADEG       PER-CENT                                    O022511200010 
      6.688        0.6         3.                                 O022511200011 
ENDCOMMON            3          0                                 O022511200012 
DATA                 3         14                                 O022511200013 
ANG-CM     DATA       ERR-T                                       O022511200014 
ADEG       MB/SR      PER-CENT                                    O022511200015 
       10.3      0.208        13.                                 O022511200016 
       12.8      0.134                                            O022511200017 
       17.1      0.146                                            O022511200018 
       21.4      0.194                                            O022511200019 
       27.4      0.208                                            O022511200020 
       32.1      0.329                                            O022511200021 
       38.5      0.231                                            O022511200022 
       40.2      0.276                                            O022511200023 
       53.1      0.114                                            O022511200024 
       64.2   0.72E-01                                            O022511200025 
       68.9   0.86E-01                                            O022511200026 
       74.5  0.563E-01                                            O022511200027 
       81.3  0.425E-01                                            O022511200028 
       91.6  0.176E-01                                            O022511200029 
ENDDATA             16          0                                 O022511200030 
ENDSUBENT           29          0                                 O022511299999 
SUBENT        O0225113   19960918                             0000O022511300001 
BIB                  3          4                                 O022511300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511300006 
ENDBIB               4          0                                 O022511300007 
COMMON               3          3                                 O022511300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511300009 
MEV        ADEG       PER-CENT                                    O022511300010 
      6.720        0.6        2.5                                 O022511300011 
ENDCOMMON            3          0                                 O022511300012 
DATA                 3         13                                 O022511300013 
ANG-CM     DATA       ERR-T                                       O022511300014 
ADEG       MB/SR      PER-CENT                                    O022511300015 
       10.3      0.226                                            O022511300016 
       14.6     0.1004                                            O022511300017 
       17.1   0.71E-01                                            O022511300018 
       23.1   0.39E-01        23.                                 O022511300019 
       27.4   0.78E-01                                            O022511300020 
        36.  0.245E-01                                            O022511300021 
       53.1   0.11E-01        40.                                 O022511300022 
       64.2  0.144E-01        14.                                 O022511300023 
       68.5   0.16E-01         6.                                 O022511300024 
       72.8  0.144E-01        21.                                 O022511300025 
       81.3   0.94E-02                                            O022511300026 
       91.6   0.85E-02        15.                                 O022511300027 
      102.7    0.5E-02        12.                                 O022511300028 
ENDDATA             15          0                                 O022511300029 
ENDSUBENT           28          0                                 O022511399999 
SUBENT        O0225114   19960918                             0000O022511400001 
BIB                  3          4                                 O022511400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511400006 
ENDBIB               4          0                                 O022511400007 
COMMON               3          3                                 O022511400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511400009 
MEV        ADEG       PER-CENT                                    O022511400010 
      6.737        0.6        2.5                                 O022511400011 
ENDCOMMON            3          0                                 O022511400012 
DATA                 3         12                                 O022511400013 
ANG-CM     DATA       ERR-T                                       O022511400014 
ADEG       MB/SR      PER-CENT                                    O022511400015 
        8.6   0.58E-01        40.                                 O022511400016 
       17.1       0.11                                            O022511400017 
       24.4     0.1102                                            O022511400018 
       27.9    0.7E-01                                            O022511400019 
       38.6  0.189E-01                                            O022511400020 
       51.4   0.14E-01        29.                                 O022511400021 
       64.3  0.269E-01                                            O022511400022 
       68.6   0.49E-01                                            O022511400023 
       72.9  0.273E-01                                            O022511400024 
       81.4  0.203E-01                                            O022511400025 
        90.    0.1E-01                                            O022511400026 
      101.6   0.59E-02                                            O022511400027 
ENDDATA             14          0                                 O022511400028 
ENDSUBENT           27          0                                 O022511499999 
SUBENT        O0225115   19960918                             0000O022511500001 
BIB                  3          4                                 O022511500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511500006 
ENDBIB               4          0                                 O022511500007 
COMMON               3          3                                 O022511500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511500009 
MEV        ADEG       PER-CENT                                    O022511500010 
      6.786        0.6        2.5                                 O022511500011 
ENDCOMMON            3          0                                 O022511500012 
DATA                 3         15                                 O022511500013 
ANG-CM     DATA       ERR-T                                       O022511500014 
ADEG       MB/SR      PER-CENT                                    O022511500015 
        8.6   0.99E-01        18.                                 O022511500016 
       12.9    0.7E-01                                            O022511500017 
       17.2   0.99E-01                                            O022511500018 
       21.5    0.9E-01                                            O022511500019 
       25.7    0.7E-01                                            O022511500020 
        30.      0.141                                            O022511500021 
       36.9  0.991E-01                                            O022511500022 
       38.6      0.131                                            O022511500023 
       50.2   0.77E-01                                            O022511500024 
       62.6   0.41E-01                                            O022511500025 
       68.6   0.32E-01                                            O022511500026 
       72.9  0.242E-01                                            O022511500027 
       81.5  0.242E-01                                            O022511500028 
        90.  0.142E-01                                            O022511500029 
      101.2   0.49E-02        16.                                 O022511500030 
ENDDATA             17          0                                 O022511500031 
ENDSUBENT           30          0                                 O022511599999 
SUBENT        O0225116   19960918                             0000O022511600001 
BIB                  3          4                                 O022511600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511600006 
ENDBIB               4          0                                 O022511600007 
COMMON               3          3                                 O022511600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511600009 
MEV        ADEG       PER-CENT                                    O022511600010 
      6.801        0.6        2.5                                 O022511600011 
ENDCOMMON            3          0                                 O022511600012 
DATA                 3         12                                 O022511600013 
ANG-CM     DATA       ERR-T                                       O022511600014 
ADEG       MB/SR      PER-CENT                                    O022511600015 
       11.6   0.35E-01        17.                                 O022511600016 
       17.2    0.3E-01        17.                                 O022511600017 
       21.5    0.3E-01        17.                                 O022511600018 
       32.6  0.468E-01                                            O022511600019 
       37.3  0.162E-01                                            O022511600020 
       38.6  0.296E-01                                            O022511600021 
       51.5  0.421E-01                                            O022511600022 
       64.3   0.35E-01                                            O022511600023 
       68.6  0.197E-01                                            O022511600024 
       72.9    0.8E-02        29.                                 O022511600025 
       81.5  0.146E-01                                            O022511600026 
      102.9  0.136E-01                                            O022511600027 
ENDDATA             14          0                                 O022511600028 
ENDSUBENT           27          0                                 O022511699999 
SUBENT        O0225117   19960918                             0000O022511700001 
BIB                  3          4                                 O022511700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511700006 
ENDBIB               4          0                                 O022511700007 
COMMON               3          3                                 O022511700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511700009 
MEV        ADEG       PER-CENT                                    O022511700010 
      6.823        0.6         3.                                 O022511700011 
ENDCOMMON            3          0                                 O022511700012 
DATA                 3         12                                 O022511700013 
ANG-CM     DATA       ERR-T                                       O022511700014 
ADEG       MB/SR      PER-CENT                                    O022511700015 
       11.6   0.14E-01        70.                                 O022511700016 
       17.2   0.14E-01        29.                                 O022511700017 
       28.3    0.2E-01        10.                                 O022511700018 
       32.6   0.69E-01                                            O022511700019 
       38.6   0.48E-01                                            O022511700020 
       40.7   0.38E-01                                            O022511700021 
       51.5  0.402E-01                                            O022511700022 
       66.9  0.182E-01                                            O022511700023 
       68.6  0.124E-01                                            O022511700024 
       72.9  0.136E-01        22.                                 O022511700025 
        84.  0.163E-01                                            O022511700026 
        93.  0.114E-01                                            O022511700027 
ENDDATA             14          0                                 O022511700028 
ENDSUBENT           27          0                                 O022511799999 
SUBENT        O0225118   19960918                             0000O022511800001 
BIB                  3          4                                 O022511800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511800006 
ENDBIB               4          0                                 O022511800007 
COMMON               3          3                                 O022511800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511800009 
MEV        ADEG       PER-CENT                                    O022511800010 
      6.843        0.6         3.                                 O022511800011 
ENDCOMMON            3          0                                 O022511800012 
DATA                 3         13                                 O022511800013 
ANG-CM     DATA       ERR-T                                       O022511800014 
ADEG       MB/SR      PER-CENT                                    O022511800015 
       12.9   0.19E-01        60.                                 O022511800016 
       17.2   0.38E-01        16.                                 O022511800017 
       25.7   0.27E-01        19.                                 O022511800018 
       28.3  0.184E-01         5.                                 O022511800019 
        33.  0.265E-01         9.                                 O022511800020 
       41.2  0.251E-01                                            O022511800021 
       51.4   0.27E-01        19.                                 O022511800022 
       64.3  0.265E-01                                            O022511800023 
       68.6  0.221E-01                                            O022511800024 
       75.4  0.128E-01        19.                                 O022511800025 
        84.  0.171E-01                                            O022511800026 
       92.6   0.74E-02                                            O022511800027 
      102.9  0.576E-02                                            O022511800028 
ENDDATA             15          0                                 O022511800029 
ENDSUBENT           28          0                                 O022511899999 
SUBENT        O0225119   19960918                             0000O022511900001 
BIB                  3          4                                 O022511900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022511900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022511900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022511900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022511900006 
ENDBIB               4          0                                 O022511900007 
COMMON               3          3                                 O022511900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022511900009 
MEV        ADEG       PER-CENT                                    O022511900010 
      6.862        0.6         3.                                 O022511900011 
ENDCOMMON            3          0                                 O022511900012 
DATA                 3         12                                 O022511900013 
ANG-CM     DATA       ERR-T                                       O022511900014 
ADEG       MB/SR      PER-CENT                                    O022511900015 
       12.9    0.2E-01        40.                                 O022511900016 
        24.   0.34E-01        26.                                 O022511900017 
       28.3  0.235E-01                                            O022511900018 
       38.6  0.252E-01                                            O022511900019 
       41.2  0.302E-01                                            O022511900020 
       51.4  0.394E-01                                            O022511900021 
       64.3  0.148E-01                                            O022511900022 
       69.9  0.211E-01                                            O022511900023 
       72.9   0.15E-01        10.                                 O022511900024 
       79.7  0.124E-01                                            O022511900025 
       92.6   0.87E-02                                            O022511900026 
      102.9   0.51E-02        10.                                 O022511900027 
ENDDATA             14          0                                 O022511900028 
ENDSUBENT           27          0                                 O022511999999 
SUBENT        O0225120   19960918                             0000O022512000001 
BIB                  3          4                                 O022512000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022512000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512000006 
ENDBIB               4          0                                 O022512000007 
COMMON               3          3                                 O022512000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512000009 
MEV        ADEG       PER-CENT                                    O022512000010 
      6.876        0.6         3.                                 O022512000011 
ENDCOMMON            3          0                                 O022512000012 
DATA                 3         11                                 O022512000013 
ANG-CM     DATA       ERR-T                                       O022512000014 
ADEG       MB/SR      PER-CENT                                    O022512000015 
        8.6      0.108        26.                                 O022512000016 
       17.2   0.63E-01                                            O022512000017 
       21.4   0.57E-01                                            O022512000018 
       36.4    0.4E-01                                            O022512000019 
       38.6  0.471E-01                                            O022512000020 
       50.2  0.435E-01                                            O022512000021 
       62.6  0.217E-01                                            O022512000022 
       68.6  0.228E-01                                            O022512000023 
       80.1  0.125E-01                                            O022512000024 
        90.   0.55E-02        18.                                 O022512000025 
      101.1   0.55E-02         9.                                 O022512000026 
ENDDATA             13          0                                 O022512000027 
ENDSUBENT           26          0                                 O022512099999 
SUBENT        O0225121   19960918                             0000O022512100001 
BIB                  3          4                                 O022512100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.4    O022512100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512100006 
ENDBIB               4          0                                 O022512100007 
COMMON               3          3                                 O022512100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512100009 
MEV        ADEG       PER-CENT                                    O022512100010 
      6.925        0.6         3.                                 O022512100011 
ENDCOMMON            3          0                                 O022512100012 
DATA                 3          8                                 O022512100013 
ANG-CM     DATA       ERR-T                                       O022512100014 
ADEG       MB/SR      PER-CENT                                    O022512100015 
       17.1  0.803E-01                                            O022512100016 
       21.4  0.803E-01                                            O022512100017 
        30.  0.803E-01                                            O022512100018 
       49.7   0.28E-01        14.                                 O022512100019 
       62.6  0.264E-01                                            O022512100020 
       68.6   0.22E-01                                            O022512100021 
       79.7  0.142E-01                                            O022512100022 
        90.    0.1E-01                                            O022512100023 
ENDDATA             10          0                                 O022512100024 
ENDSUBENT           23          0                                 O022512199999 
SUBENT        O0225122   19960918                             0000O022512200001 
BIB                  3          4                                 O022512200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP)  From Fig.5   O022512200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512200006 
ENDBIB               4          0                                 O022512200007 
COMMON               3          3                                 O022512200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512200009 
MEV        ADEG       PER-CENT                                    O022512200010 
      6.940        0.6         3.                                 O022512200011 
ENDCOMMON            3          0                                 O022512200012 
DATA                 3          9                                 O022512200013 
ANG-CM     DATA       ERR-T                                       O022512200014 
ADEG       MB/SR      PER-CENT                                    O022512200015 
        17.   0.35E-01        30.                                 O022512200016 
        23.   0.23E-01        30.                                 O022512200017 
       25.5   0.19E-01        26.                                 O022512200018 
       55.1   0.27E-01        22.                                 O022512200019 
        68.  0.179E-01                                            O022512200020 
       70.9   0.95E-02         9.                                 O022512200021 
       83.8  0.102E-01                                            O022512200022 
        94.   0.52E-02         6.                                 O022512200023 
      102.6   0.47E-02        17.                                 O022512200024 
ENDDATA             11          0                                 O022512200025 
ENDSUBENT           24          0                                 O022512299999 
SUBENT        O0225123   19960918                             0000O022512300001 
BIB                  3          4                                 O022512300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512300006 
ENDBIB               4          0                                 O022512300007 
COMMON               3          3                                 O022512300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512300009 
MEV        ADEG       PER-CENT                                    O022512300010 
      6.965        0.6         3.                                 O022512300011 
ENDCOMMON            3          0                                 O022512300012 
DATA                 3         13                                 O022512300013 
ANG-CM     DATA       ERR-T                                       O022512300014 
ADEG       MB/SR      PER-CENT                                    O022512300015 
       13.9   0.74E-01        40.                                 O022512300016 
       22.5   0.63E-01                                            O022512300017 
       25.8   0.42E-01        17.                                 O022512300018 
       29.7  0.315E-01                                            O022512300019 
       35.3  0.614E-01                                            O022512300020 
       42.2  0.498E-01                                            O022512300021 
       52.9    0.5E-01        10.                                 O022512300022 
       65.2   0.11E-01        25.                                 O022512300023 
       70.4  0.174E-01                                            O022512300024 
       76.4   0.19E-01        16.                                 O022512300025 
       83.6  0.123E-01                                            O022512300026 
       93.5   0.93E-02                                            O022512300027 
      102.4   0.39E-02        18.                                 O022512300028 
ENDDATA             15          0                                 O022512300029 
ENDSUBENT           28          0                                 O022512399999 
SUBENT        O0225124   19960918                             0000O022512400001 
BIB                  3          4                                 O022512400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512400006 
ENDBIB               4          0                                 O022512400007 
COMMON               3          3                                 O022512400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512400009 
MEV        ADEG       PER-CENT                                    O022512400010 
      6.992        0.6         3.                                 O022512400011 
ENDCOMMON            3          0                                 O022512400012 
DATA                 3         10                                 O022512400013 
ANG-CM     DATA       ERR-T                                       O022512400014 
ADEG       MB/SR      PER-CENT                                    O022512400015 
        16.    0.5E-01        30.                                 O022512400016 
        22.      0.109                                            O022512400017 
       26.3   0.85E-01                                            O022512400018 
       34.9   0.94E-01                                            O022512400019 
       41.7   0.39E-01                                            O022512400020 
       64.8  0.294E-01                                            O022512400021 
       69.9  0.282E-01                                            O022512400022 
        76.  0.302E-01                                            O022512400023 
       84.4  0.123E-01                                            O022512400024 
        93. 0.1022E-01                                            O022512400025 
ENDDATA             12          0                                 O022512400026 
ENDSUBENT           25          0                                 O022512499999 
SUBENT        O0225125   19960918                             0000O022512500001 
BIB                  3          4                                 O022512500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512500006 
ENDBIB               4          0                                 O022512500007 
COMMON               3          3                                 O022512500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512500009 
MEV        ADEG       PER-CENT                                    O022512500010 
      7.019        0.6         3.                                 O022512500011 
ENDCOMMON            3          0                                 O022512500012 
DATA                 3         12                                 O022512500013 
ANG-CM     DATA       ERR-T                                       O022512500014 
ADEG       MB/SR      PER-CENT                                    O022512500015 
       13.8   0.32E-01        60.                                 O022512500016 
       21.6   0.78E-01                                            O022512500017 
       26.8      0.124                                            O022512500018 
       32.8  0.932E-01                                            O022512500019 
       37.1      0.133                                            O022512500020 
       41.3  0.425E-01                                            O022512500021 
       54.2  0.652E-01                                            O022512500022 
        67.   0.29E-01                                            O022512500023 
       71.3  0.298E-01                                            O022512500024 
       76.4  0.258E-01                                            O022512500025 
       84.1  0.171E-01                                            O022512500026 
      103.3   0.64E-02         6.                                 O022512500027 
ENDDATA             14          0                                 O022512500028 
ENDSUBENT           27          0                                 O022512599999 
SUBENT        O0225126   19960918                             0000O022512600001 
BIB                  3          4                                 O022512600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512600006 
ENDBIB               4          0                                 O022512600007 
COMMON               3          3                                 O022512600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512600009 
MEV        ADEG       PER-CENT                                    O022512600010 
      7.046        0.6         3.                                 O022512600011 
ENDCOMMON            3          0                                 O022512600012 
DATA                 3         10                                 O022512600013 
ANG-CM     DATA       ERR-T                                       O022512600014 
ADEG       MB/SR      PER-CENT                                    O022512600015 
       25.4   0.47E-01        15.                                 O022512600016 
       30.5  0.298E-01                                            O022512600017 
       36.5  0.357E-01                                            O022512600018 
       40.8  0.397E-01                                            O022512600019 
       53.7   0.47E-01         9.                                 O022512600020 
        66.  0.136E-01        10.                                 O022512600021 
       70.7  0.116E-01                                            O022512600022 
       75.8   0.74E-02        23.                                 O022512600023 
       83.5  0.854E-02                                            O022512600024 
       92.1  0.102E-01                                            O022512600025 
ENDDATA             12          0                                 O022512600026 
ENDSUBENT           25          0                                 O022512699999 
SUBENT        O0225127   19960918                             0000O022512700001 
BIB                  3          4                                 O022512700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512700006 
ENDBIB               4          0                                 O022512700007 
COMMON               3          3                                 O022512700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512700009 
MEV        ADEG       PER-CENT                                    O022512700010 
      7.061        0.6         3.                                 O022512700011 
ENDCOMMON            3          0                                 O022512700012 
DATA                 3         13                                 O022512700013 
ANG-CM     DATA       ERR-T                                       O022512700014 
ADEG       MB/SR      PER-CENT                                    O022512700015 
       11.8       0.18        17.                                 O022512700016 
       14.4      0.133                                            O022512700017 
       20.5      0.178                                            O022512700018 
       24.8     0.1287                                            O022512700019 
       31.3  0.962E-01                                            O022512700020 
       34.4      0.124                                            O022512700021 
       40.4  0.663E-01                                            O022512700022 
       53.5  0.673E-01                                            O022512700023 
       66.5  0.243E-01                                            O022512700024 
       70.9  0.352E-01                                            O022512700025 
       76.1    0.4E-01                                            O022512700026 
       83.9  0.247E-01                                            O022512700027 
      102.9    0.8E-02        16.                                 O022512700028 
ENDDATA             15          0                                 O022512700029 
ENDSUBENT           28          0                                 O022512799999 
SUBENT        O0225128   19960918                             0000O022512800001 
BIB                  3          4                                 O022512800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512800006 
ENDBIB               4          0                                 O022512800007 
COMMON               3          3                                 O022512800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512800009 
MEV        ADEG       PER-CENT                                    O022512800010 
      7.080        0.6         3.                                 O022512800011 
ENDCOMMON            3          0                                 O022512800012 
DATA                 3         14                                 O022512800013 
ANG-CM     DATA       ERR-T                                       O022512800014 
ADEG       MB/SR      PER-CENT                                    O022512800015 
       12.3       0.18        22.                                 O022512800016 
       13.9   0.77E-01        18.                                 O022512800017 
       19.9   0.37E-01        19.                                 O022512800018 
       24.3   0.46E-01        20.                                 O022512800019 
       28.6  0.281E-01        10.                                 O022512800020 
       35.2  0.444E-01         4.                                 O022512800021 
        40.  0.292E-01         5.                                 O022512800022 
       51.3   0.54E-01        19.                                 O022512800023 
       63.9  0.283E-01                                            O022512800024 
       70.4  0.284E-01         4.                                 O022512800025 
       74.7   0.16E-01        25.                                 O022512800026 
       81.7  0.118E-01                                            O022512800027 
        92.   0.55E-02        16.                                 O022512800028 
      101.7  0.111E-01         5.                                 O022512800029 
ENDDATA             16          0                                 O022512800030 
ENDSUBENT           29          0                                 O022512899999 
SUBENT        O0225129   19960918                             0000O022512900001 
BIB                  3          4                                 O022512900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022512900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022512900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022512900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022512900006 
ENDBIB               4          0                                 O022512900007 
COMMON               3          3                                 O022512900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022512900009 
MEV        ADEG       PER-CENT                                    O022512900010 
      7.114        0.6         3.                                 O022512900011 
ENDCOMMON            3          0                                 O022512900012 
DATA                 3         13                                 O022512900013 
ANG-CM     DATA       ERR-T                                       O022512900014 
ADEG       MB/SR      PER-CENT                                    O022512900015 
       10.9      0.128        23.                                 O022512900016 
        13.   0.69E-01        22.                                 O022512900017 
       22.6   0.98E-01                                            O022512900018 
       26.6      0.128                                            O022512900019 
        33.  0.653E-01                                            O022512900020 
       36.9  0.291E-01                                            O022512900021 
       40.4  0.301E-01                                            O022512900022 
        50.  0.629E-01                                            O022512900023 
       67.7  0.156E-01                                            O022512900024 
       74.2    0.6E-02        30.                                 O022512900025 
       81.2 0.1003E-01                                            O022512900026 
       91.2 0.1112E-01                                            O022512900027 
      100.2   0.27E-02        22.                                 O022512900028 
ENDDATA             15          0                                 O022512900029 
ENDSUBENT           28          0                                 O022512999999 
SUBENT        O0225130   19960918                             0000O022513000001 
BIB                  3          4                                 O022513000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513000006 
ENDBIB               4          0                                 O022513000007 
COMMON               3          3                                 O022513000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513000009 
MEV        ADEG       PER-CENT                                    O022513000010 
      7.174        0.6         3.                                 O022513000011 
ENDCOMMON            3          0                                 O022513000012 
DATA                 3          8                                 O022513000013 
ANG-CM     DATA       ERR-T                                       O022513000014 
ADEG       MB/SR      PER-CENT                                    O022513000015 
       12.8   0.24E-01        50.                                 O022513000016 
       18.8   0.38E-01        24.                                 O022513000017 
       23.1   0.59E-01        14.                                 O022513000018 
       33.3  0.614E-01                                            O022513000019 
       37.6   0.27E-01                                            O022513000020 
       68.3   0.17E-01                                            O022513000021 
       74.3  0.147E-01        13.                                 O022513000022 
       80.3  0.203E-01                                            O022513000023 
ENDDATA             10          0                                 O022513000024 
ENDSUBENT           23          0                                 O022513099999 
SUBENT        O0225131   19960918                             0000O022513100001 
BIB                  3          4                                 O022513100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513100006 
ENDBIB               4          0                                 O022513100007 
COMMON               3          3                                 O022513100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513100009 
MEV        ADEG       PER-CENT                                    O022513100010 
      7.192        0.6         3.                                 O022513100011 
ENDCOMMON            3          0                                 O022513100012 
DATA                 3          9                                 O022513100013 
ANG-CM     DATA       ERR-T                                       O022513100014 
ADEG       MB/SR      PER-CENT                                    O022513100015 
       18.4   0.64E-01        17.                                 O022513100016 
       33.3      0.117                                            O022513100017 
       40.6  0.472E-01                                            O022513100018 
       50.4   0.34E-01        26.                                 O022513100019 
        70.  0.214E-01                                            O022513100020 
       73.9  0.242E-01                                            O022513100021 
       81.1  0.127E-01                                            O022513100022 
       91.4   0.75E-02        11.                                 O022513100023 
      101.6    0.7E-02                                            O022513100024 
ENDDATA             11          0                                 O022513100025 
ENDSUBENT           24          0                                 O022513199999 
SUBENT        O0225132   19960918                             0000O022513200001 
BIB                  3          4                                 O022513200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513200006 
ENDBIB               4          0                                 O022513200007 
COMMON               3          3                                 O022513200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513200009 
MEV        ADEG       PER-CENT                                    O022513200010 
      7.219        0.6         3.                                 O022513200011 
ENDCOMMON            3          0                                 O022513200012 
DATA                 3          7                                 O022513200013 
ANG-CM     DATA       ERR-T                                       O022513200014 
ADEG       MB/SR      PER-CENT                                    O022513200015 
       33.3   0.27E-01        11.                                 O022513200016 
       38.9  0.172E-01                                            O022513200017 
       51.2   0.26E-01        40.                                 O022513200018 
        70.  0.107E-01                                            O022513200019 
       74.3   0.49E-02        30.                                 O022513200020 
       91.4  0.689E-02                                            O022513200021 
      102.4  0.684E-02                                            O022513200022 
ENDDATA              9          0                                 O022513200023 
ENDSUBENT           22          0                                 O022513299999 
SUBENT        O0225133   19960918                             0000O022513300001 
BIB                  3          4                                 O022513300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513300006 
ENDBIB               4          0                                 O022513300007 
COMMON               3          3                                 O022513300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513300009 
MEV        ADEG       PER-CENT                                    O022513300010 
      7.239        0.6         3.                                 O022513300011 
ENDCOMMON            3          0                                 O022513300012 
DATA                 3         10                                 O022513300013 
ANG-CM     DATA       ERR-T                                       O022513300014 
ADEG       MB/SR      PER-CENT                                    O022513300015 
       10.3      0.269                                            O022513300016 
       19.7       0.11                                            O022513300017 
       33.3      0.152                                            O022513300018 
       38.4   0.77E-01                                            O022513300019 
       42.7     0.1025                                            O022513300020 
       51.2   0.42E-01        26.                                 O022513300021 
        64.  0.263E-01                                            O022513300022 
        70.   0.31E-01                                            O022513300023 
       74.3   0.35E-01                                            O022513300024 
       82.4  0.212E-01                                            O022513300025 
ENDDATA             12          0                                 O022513300026 
ENDSUBENT           25          0                                 O022513399999 
SUBENT        O0225134   19960918                             0000O022513400001 
BIB                  3          4                                 O022513400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513400006 
ENDBIB               4          0                                 O022513400007 
COMMON               3          3                                 O022513400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513400009 
MEV        ADEG       PER-CENT                                    O022513400010 
      7.268        0.6         3.                                 O022513400011 
ENDCOMMON            3          0                                 O022513400012 
DATA                 3         11                                 O022513400013 
ANG-CM     DATA       ERR-T                                       O022513400014 
ADEG       MB/SR      PER-CENT                                    O022513400015 
        12.    0.9E-01        30.                                 O022513400016 
        15.   0.31E-01        40.                                 O022513400017 
       18.8   0.49E-01        16.                                 O022513400018 
       23.5   0.42E-01        10.                                 O022513400019 
       35.9   0.23E-01        13.                                 O022513400020 
       51.2    0.3E-01        30.                                 O022513400021 
        70.   0.63E-02        10.                                 O022513400022 
       74.3  0.126E-01        18.                                 O022513400023 
       82.4    0.9E-02                                            O022513400024 
       91.3   0.48E-02        15.                                 O022513400025 
      101.6   0.51E-02        18.                                 O022513400026 
ENDDATA             13          0                                 O022513400027 
ENDSUBENT           26          0                                 O022513499999 
SUBENT        O0225135   19960918                             0000O022513500001 
BIB                  3          4                                 O022513500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513500006 
ENDBIB               4          0                                 O022513500007 
COMMON               3          3                                 O022513500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513500009 
MEV        ADEG       PER-CENT                                    O022513500010 
      7.302        0.6         3.                                 O022513500011 
ENDCOMMON            3          0                                 O022513500012 
DATA                 3         12                                 O022513500013 
ANG-CM     DATA       ERR-T                                       O022513500014 
ADEG       MB/SR      PER-CENT                                    O022513500015 
       11.1    0.8E-01        30.                                 O022513500016 
       14.1   0.49E-01        24.                                 O022513500017 
       23.1   0.32E-01        25.                                 O022513500018 
       33.3  0.587E-01                                            O022513500019 
       37.6  0.653E-01                                            O022513500020 
       40.1  0.702E-01                                            O022513500021 
       51.2   0.22E-01        40.                                 O022513500022 
       62.3   0.21E-01        50.                                 O022513500023 
       69.6  0.134E-01                                            O022513500024 
       74.3   0.16E-01        16.                                 O022513500025 
       81.1  0.102E-01                                            O022513500026 
      100.7   0.42E-02        21.                                 O022513500027 
ENDDATA             14          0                                 O022513500028 
ENDSUBENT           27          0                                 O022513599999 
SUBENT        O0225136   19960918                             0000O022513600001 
BIB                  3          4                                 O022513600002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513600003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513600004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513600005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513600006 
ENDBIB               4          0                                 O022513600007 
COMMON               3          3                                 O022513600008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513600009 
MEV        ADEG       PER-CENT                                    O022513600010 
      7.325        0.6         3.                                 O022513600011 
ENDCOMMON            3          0                                 O022513600012 
DATA                 3         11                                 O022513600013 
ANG-CM     DATA       ERR-T                                       O022513600014 
ADEG       MB/SR      PER-CENT                                    O022513600015 
       10.3      0.133        22.                                 O022513600016 
       14.1   0.78E-01        10.                                 O022513600017 
       23.1   0.32E-01        28.                                 O022513600018 
        38.  0.465E-01                                            O022513600019 
       50.4   0.26E-01        30.                                 O022513600020 
       63.2   0.97E-02        15.                                 O022513600021 
       68.3  0.989E-02                                            O022513600022 
       73.8  0.107E-01        23.                                 O022513600023 
       80.2 0.1073E-01                                            O022513600024 
       91.3  0.108E-01                                            O022513600025 
      100.3   0.82E-02                                            O022513600026 
ENDDATA             13          0                                 O022513600027 
ENDSUBENT           26          0                                 O022513699999 
SUBENT        O0225137   19960918                             0000O022513700001 
BIB                  3          4                                 O022513700002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513700003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513700004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513700005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513700006 
ENDBIB               4          0                                 O022513700007 
COMMON               3          3                                 O022513700008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513700009 
MEV        ADEG       PER-CENT                                    O022513700010 
      7.343        0.6         3.                                 O022513700011 
ENDCOMMON            3          0                                 O022513700012 
DATA                 3         11                                 O022513700013 
ANG-CM     DATA       ERR-T                                       O022513700014 
ADEG       MB/SR      PER-CENT                                    O022513700015 
       10.2   0.49E-01        50.                                 O022513700016 
        12.   0.83E-01        17.                                 O022513700017 
        23.      0.128                                            O022513700018 
       33.3  0.706E-01                                            O022513700019 
       37.6  0.374E-01                                            O022513700020 
       50.4   0.19E-01        50.                                 O022513700021 
       63.2  0.223E-01                                            O022513700022 
       67.4  0.318E-01                                            O022513700023 
       72.6   0.38E-01                                            O022513700024 
       89.6  0.781E-02                                            O022513700025 
      100.3   0.51E-02        12.                                 O022513700026 
ENDDATA             13          0                                 O022513700027 
ENDSUBENT           26          0                                 O022513799999 
SUBENT        O0225138   19960918                             0000O022513800001 
BIB                  3          4                                 O022513800002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513800003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513800004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513800005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513800006 
ENDBIB               4          0                                 O022513800007 
COMMON               3          3                                 O022513800008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513800009 
MEV        ADEG       PER-CENT                                    O022513800010 
      7.382        0.6         3.                                 O022513800011 
ENDCOMMON            3          0                                 O022513800012 
DATA                 3         10                                 O022513800013 
ANG-CM     DATA       ERR-T                                       O022513800014 
ADEG       MB/SR      PER-CENT                                    O022513800015 
       17.8   0.23E-01        30.                                 O022513800016 
       24.2   0.29E-01        24.                                 O022513800017 
       38.3  0.444E-01                                            O022513800018 
       50.2   0.26E-01        40.                                 O022513800019 
        63.  0.227E-01                                            O022513800020 
       68.9  0.157E-01                                            O022513800021 
       75.8  0.113E-01        14.                                 O022513800022 
       80.9  0.838E-02                                            O022513800023 
       92.8   0.52E-02        12.                                 O022513800024 
      101.3   0.36E-02        22.                                 O022513800025 
ENDDATA             12          0                                 O022513800026 
ENDSUBENT           25          0                                 O022513899999 
SUBENT        O0225139   19960918                             0000O022513900001 
BIB                  3          4                                 O022513900002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022513900003 
EN-SEC     (E-EXC,82-PB-208)                                      O022513900004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022513900005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022513900006 
ENDBIB               4          0                                 O022513900007 
COMMON               3          3                                 O022513900008 
E-EXC      ANG-ERR    DATA-ERR                                    O022513900009 
MEV        ADEG       PER-CENT                                    O022513900010 
      7.404        0.6         3.                                 O022513900011 
ENDCOMMON            3          0                                 O022513900012 
DATA                 3         10                                 O022513900013 
ANG-CM     DATA       ERR-T                                       O022513900014 
ADEG       MB/SR      PER-CENT                                    O022513900015 
       17.8   0.74E-01                                            O022513900016 
       22.9    0.5E-01        14.                                 O022513900017 
       32.7   0.88E-01                                            O022513900018 
       50.2   0.31E-01        30.                                 O022513900019 
        63.  0.235E-01                                            O022513900020 
       68.9  0.119E-01                                            O022513900021 
       74.1  0.306E-01                                            O022513900022 
        80.  0.168E-01                                            O022513900023 
       90.2   0.53E-02        17.                                 O022513900024 
       100.    0.7E-02                                            O022513900025 
ENDDATA             12          0                                 O022513900026 
ENDSUBENT           25          0                                 O022513999999 
SUBENT        O0225140   19960918                             0000O022514000001 
BIB                  3          4                                 O022514000002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514000003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514000004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514000005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514000006 
ENDBIB               4          0                                 O022514000007 
COMMON               3          3                                 O022514000008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514000009 
MEV        ADEG       PER-CENT                                    O022514000010 
      7.549        0.6         3.                                 O022514000011 
ENDCOMMON            3          0                                 O022514000012 
DATA                 3          9                                 O022514000013 
ANG-CM     DATA       ERR-T                                       O022514000014 
ADEG       MB/SR      PER-CENT                                    O022514000015 
       18.7    0.2E-01        50.                                 O022514000016 
       24.7   0.44E-01        20.                                 O022514000017 
       39.1  0.249E-01                                            O022514000018 
       51.9   0.13E-01        60.                                 O022514000019 
       65.5  0.292E-01                                            O022514000020 
       75.3    0.3E-01                                            O022514000021 
       82.6  0.204E-01                                            O022514000022 
       93.7  0.104E-01                                            O022514000023 
       103.   0.73E-02        10.                                 O022514000024 
ENDDATA             11          0                                 O022514000025 
ENDSUBENT           24          0                                 O022514099999 
SUBENT        O0225141   19960918                             0000O022514100001 
BIB                  3          4                                 O022514100002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514100003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514100004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514100005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514100006 
ENDBIB               4          0                                 O022514100007 
COMMON               3          3                                 O022514100008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514100009 
MEV        ADEG       PER-CENT                                    O022514100010 
      7.573        0.6         3.                                 O022514100011 
ENDCOMMON            3          0                                 O022514100012 
DATA                 3         11                                 O022514100013 
ANG-CM     DATA       ERR-T                                       O022514100014 
ADEG       MB/SR      PER-CENT                                    O022514100015 
       17.8   0.26E-01        30.                                 O022514100016 
       26.4   0.59E-01        19.                                 O022514100017 
        34.      0.103                                            O022514100018 
       39.1  0.352E-01                                            O022514100019 
       42.1  0.352E-01                                            O022514100020 
       51.9   0.33E-01        24.                                 O022514100021 
       64.7  0.223E-01                                            O022514100022 
       75.8  0.298E-01                                            O022514100023 
        83.  0.216E-01                                            O022514100024 
       92.8  0.132E-01                                            O022514100025 
      102.2   0.54E-02        13.                                 O022514100026 
ENDDATA             13          0                                 O022514100027 
ENDSUBENT           26          0                                 O022514199999 
SUBENT        O0225142   19960918                             0000O022514200001 
BIB                  3          4                                 O022514200002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514200003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514200004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514200005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514200006 
ENDBIB               4          0                                 O022514200007 
COMMON               3          3                                 O022514200008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514200009 
MEV        ADEG       PER-CENT                                    O022514200010 
      7.594        0.6         3.                                 O022514200011 
ENDCOMMON            3          0                                 O022514200012 
DATA                 3         10                                 O022514200013 
ANG-CM     DATA       ERR-T                                       O022514200014 
ADEG       MB/SR      PER-CENT                                    O022514200015 
       13.6   0.45E-01        27.                                 O022514200016 
       18.3   0.43E-01        16.                                 O022514200017 
       24.7   0.52E-01        19.                                 O022514200018 
       34.9  0.485E-01                                            O022514200019 
       41.3  0.446E-01                                            O022514200020 
       50.2   0.58E-01        12.                                 O022514200021 
       74.1  0.268E-01                                            O022514200022 
       80.9  0.206E-01         7.                                 O022514200023 
       91.5  0.123E-01                                            O022514200024 
      101.3  0.132E-01                                            O022514200025 
ENDDATA             12          0                                 O022514200026 
ENDSUBENT           25          0                                 O022514299999 
SUBENT        O0225143   19960918                             0000O022514300001 
BIB                  3          4                                 O022514300002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514300003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514300004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514300005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514300006 
ENDBIB               4          0                                 O022514300007 
COMMON               3          3                                 O022514300008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514300009 
MEV        ADEG       PER-CENT                                    O022514300010 
      7.684        0.6         3.                                 O022514300011 
ENDCOMMON            3          0                                 O022514300012 
DATA                 3          9                                 O022514300013 
ANG-CM     DATA       ERR-T                                       O022514300014 
ADEG       MB/SR      PER-CENT                                    O022514300015 
       11.2   0.43E-01        19.                                 O022514300016 
       19.4  0.516E-01                                            O022514300017 
       40.4   0.24E-01        25.                                 O022514300018 
       52.2  0.101E-01        18.                                 O022514300019 
       59.2   0.92E-02        14.                                 O022514300020 
       63.2  0.132E-01        18.                                 O022514300021 
       69.1  0.111E-01                                            O022514300022 
       82.8    0.7E-02                                            O022514300023 
        91.  0.799E-02                                            O022514300024 
ENDDATA             11          0                                 O022514300025 
ENDSUBENT           24          0                                 O022514399999 
SUBENT        O0225144   19960918                             0000O022514400001 
BIB                  3          4                                 O022514400002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514400003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514400004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514400005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514400006 
ENDBIB               4          0                                 O022514400007 
COMMON               3          3                                 O022514400008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514400009 
MEV        ADEG       PER-CENT                                    O022514400010 
      7.723        0.6         3.                                 O022514400011 
ENDCOMMON            3          0                                 O022514400012 
DATA                 3          8                                 O022514400013 
ANG-CM     DATA       ERR-T                                       O022514400014 
ADEG       MB/SR      PER-CENT                                    O022514400015 
       13.6   0.85E-01        20.                                 O022514400016 
       24.3      0.127                                            O022514400017 
        52.   0.22E-01        27.                                 O022514400018 
       63.9  0.214E-01        13.                                 O022514400019 
       69.4  0.328E-01                                            O022514400020 
       75.8  0.316E-01                                            O022514400021 
       81.8  0.937E-02                                            O022514400022 
       92.4  0.781E-02                                            O022514400023 
ENDDATA             10          0                                 O022514400024 
ENDSUBENT           23          0                                 O022514499999 
SUBENT        O0225145   19960918                             0000O022514500001 
BIB                  3          4                                 O022514500002 
REACTION   (82-PB-208(P,INL)82-PB-208,PAR,DA,,,EXP) From Fig.5    O022514500003 
EN-SEC     (E-EXC,82-PB-208)                                      O022514500004 
ERR-ANALYS (ERR-T).The Uncertainty is Reported by Authors.        O022514500005 
           (DATA-ERR).Data-Point Reader Uncertainty.              O022514500006 
ENDBIB               4          0                                 O022514500007 
COMMON               3          3                                 O022514500008 
E-EXC      ANG-ERR    DATA-ERR                                    O022514500009 
MEV        ADEG       PER-CENT                                    O022514500010 
      8.166        0.5         3.                                 O022514500011 
ENDCOMMON            3          0                                 O022514500012 
DATA                 3          8                                 O022514500013 
ANG-CM     DATA       ERR-T                                       O022514500014 
ADEG       MB/SR      PER-CENT                                    O022514500015 
       13.6   0.58E-01        24.                                 O022514500016 
       39.2  0.766E-01                                            O022514500017 
        63.  0.483E-01                                            O022514500018 
       68.1  0.536E-01                                            O022514500019 
       74.1  0.685E-01                                            O022514500020 
       80.9  0.193E-01                                            O022514500021 
       91.2   0.92E-02                                            O022514500022 
      102.2  0.921E-02                                            O022514500023 
ENDDATA             10          0                                 O022514500024 
ENDSUBENT           23          0                                 O022514599999 
SUBENT        O0225146   19960918                             0000O022514600001 
BIB                  2          2                                 O022514600002 
REACTION   (82-PB-208(P,EL)82-PB-208,,DA,,,EXP) From Fig.5        O022514600003 
ERR-ANALYS (DATA-ERR).Data-Point Reader Uncertainty.              O022514600004 
ENDBIB               2          0                                 O022514600005 
COMMON               2          3                                 O022514600006 
ANG-ERR    DATA-ERR                                               O022514600007 
ADEG       PER-CENT                                               O022514600008 
        0.3        1.9                                            O022514600009 
ENDCOMMON            3          0                                 O022514600010 
DATA                 2         23                                 O022514600011 
ANG-CM     DATA                                                   O022514600012 
ADEG       MB/SR                                                  O022514600013 
       12.2  0.494E+05                                            O022514600014 
       15.9 0.1576E+05                                            O022514600015 
       20.9      5050.                                            O022514600016 
       24.9      1980.                                            O022514600017 
       28.4       826.                                            O022514600018 
       30.8       588.                                            O022514600019 
       31.1       335.                                            O022514600020 
       35.8       166.                                            O022514600021 
       40.3      147.1                                            O022514600022 
       44.2      125.6                                            O022514600023 
       48.6        79.                                            O022514600024 
       52.2       28.7                                            O022514600025 
       56.2      11.23                                            O022514600026 
       59.1       17.4                                            O022514600027 
       64.6       24.6                                            O022514600028 
       67.8       19.2                                            O022514600029 
       70.3      10.71                                            O022514600030 
       75.4       3.02                                            O022514600031 
       79.8        2.9                                            O022514600032 
        84.       4.51                                            O022514600033 
       88.3       5.58                                            O022514600034 
       92.1       3.55                                            O022514600035 
       95.6      1.463                                            O022514600036 
ENDDATA             25          0                                 O022514600037 
ENDSUBENT           36          0                                 O022514699999 
ENDENTRY           146          0                                 O022599999999